Highlights
- Final geological logging of the winter 2022 drill program has identified spodumene mineralization over varying intervals in each1 drill hole completed
- Wide intervals of continuous pegmatite intersected in multiple drill holes (<2 m to 135.7 m) with the main pegmatite body interpreted to be widening with depth
- Spodumene pegmatite has been logged as far down as approximately 265 m vertical depth (CV22-034), with the hole ending in spodumene pegmatite
- The logging of the winter program drill core (4,345 m over 20 holes) has informed the planning of an approximate 15,000 m summer/fall drill program starting in early
June 2022 , which has been increased to three (3) drill rigs, with objectives to:- Infill drill the current approximately 1,400 m strike, which has now been tested at approximately 100 m spacing
- Drill step outs along strike at both ends and to depth, all of which the pegmatite remains open
- Explore further and drill test other spodumene pegmatite outcrops identified on the Property
As outlined in news release dated
A summary of drill holes completed to date in 2022, along with logged pegmatite intercepts greater than two (2) metres, are presented in Table 1. Drill hole locations and cross-sections, based on drill and surface data collected to date, are presented in Figures 1 and 2, respectively.
The final drill hole of the program, CV22-034, was paused in spodumene pegmatite (field identified) – and the drill put on temporary standby – to respect a regional pause in exploration activities as requested by the local communities to accommodate the goose hunting season. The exploration activities at Corvette will resume in early June, where drill hole CV22-034 will be continued.
Detailed planning is underway for the remaining approximately 15,000 m campaign to be completed over the summer/fall period. This drilling will focus on continued land-based infill and step-out holes around CV5-6 and CV1-2, as well as testing new regional targets (see news release dated
The aggressive 2022 drill campaign is being completed as a direct follow-up to the strong lithium-tantalum mineralization encountered in the first four (4) drill holes to test the CV5-6 pegmatite this past fall. Drill intercept highlights include 155.1 m at 0.94% Li2O and 117 ppm Ta2O5 (CF21-002), and 58.1 m at 1.25% Li2O and 194 ppm Ta2O5 (CF21-003) (see news releases dated
The winter/spring phase of the 2022 drill campaign began in late February with two diamond drill rigs, which remain on site in preparation for the summer/fall phase of the drilling expected to commence in early June. A total of twenty (20) NQ size diamond drill holes (4,345 m) were completed during the winter/spring phase and included seventeen (17) holes collared over ice, and three (3) holes collared over land. The primary objective of the winter/spring drill program was to test for mineralized pegmatite along strike from surface outcrops, potentially connecting the CV5-6 pegmatites with the CV1-2 pegmatites, as well as testing the mineralization at depth. Geological modelling, based on drilling to date, indicates the target pegmatite has a strike length of at least 1,400 m and is widening at depth. All 2022 drill core analysis is pending, although spodumene has been field identified all1 2022 drill holes completed to date.
The Company notes that it has developed a COVID Management Plan for the program and will carry out its field programs while adhering to all federal, provincial, and regional restrictions in place due to the COVID-19 pandemic. Mineral exploration has been recognized as an essential service in
Table 1: Pegmatite intercepts (> 2 m) logged in 2022 drill holes at the Corvette Property
https://www.globenewswire.com/NewsRoom/AttachmentNg/dfe347b0-e502-40ff-90e2-dd48593554ec
Figure 1: 2022 drill hole collar locations
https://www.globenewswire.com/NewsRoom/AttachmentNg/d881672f-5caa-4bdd-a4d6-62e135e7b7e6
Figures 2A-2G: Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals
https://www.globenewswire.com/NewsRoom/AttachmentNg/063eda7c-a6ff-4aba-9590-486871b018cf
https://www.globenewswire.com/NewsRoom/AttachmentNg/de6c2a09-0920-4044-a90f-d0662c7918e8
https://www.globenewswire.com/NewsRoom/AttachmentNg/b1e1b6cc-2177-488a-b62d-a06c2303dc98
https://www.globenewswire.com/NewsRoom/AttachmentNg/12b6f621-b9a7-4d8e-baaa-a806fb6afe84
https://www.globenewswire.com/NewsRoom/AttachmentNg/edc98858-9f42-4a40-9d78-6d726d4e38e2
https://www.globenewswire.com/NewsRoom/AttachmentNg/6e85f513-9ddc-4099-b2a2-881cf68589d9
https://www.globenewswire.com/NewsRoom/AttachmentNg/ef1a446b-32c1-4259-9a0d-31f466f0eb2a
About the CV Lithium Trend
The CV Lithium Trend is an emerging spodumene pegmatite district discovered by the Company in 2017 and spans the FCI West, FCI East, and Corvette claim blocks. The core area includes an approximate 2 km long corridor, which is part of the more than 25-km long and Property-wide CV Lithium Trend. It consists of numerous spodumene pegmatite occurrences, which include the CV1, CV2, CV3, CV5, CV6, and CV7 pegmatites, highlighted by the CV5 Pegmatite – a large (~220 m long and 20-40 m wide), well-mineralized outcrop with drill intercepts of 155.1 m at 0.94% Li2O and 117 ppm Ta2O5 (CF21-002), and 58.1 m at 1.25% Li2O and 194 ppm Ta2O5 (CF21-003). Drilling indicates a pegmatite body approximating 60 m in true width (at CF21-001 and 003), and therefore considerably larger than that observed in outcrop. The high number of well-mineralized pegmatites in this core area of the trend indicate a strong potential for a series of relatively closely spaced/stacked, sub-parallel, and sizable spodumene-bearing pegmatite bodies, with significant lateral and depth extent, to be present.
Qualified Person
- No pegmatite or spodumene mineralization was logged in drill hole CV22-032. This hole was lost at depth due to drilling conditions, prior to reaching its target.
About
The Company’s flagship asset is the Corvette Property, which includes the wholly owned Corvette, FCI East, FCI West, Deca-Goose, Felix, and Corvette East claim blocks, located in the
The Company also holds 100% ownership of the Freeman Creek Gold Property in
The Company’s other assets include the Pontax Lithium-Gold Property, QC; and the Hidden Lake Lithium Property, NWT, where the Company maintains a 40% interest, as well as several other assets in
For further information, please contact us at info@patriotbatterymetals.com Tel: +1 (778) 945-2950 , or visit www.patriotbatterymetals.com.
On Behalf of the Board of Directors, | ||
“ | “ | |
Disclaimer for Forward-Looking Information
Statements included in this announcement, including statements concerning our plans, intentions, and expectations, which are not historical in nature are intended to be, and are hereby identified as, “forward-looking statements”. Forward-looking statements may be identified by words including “anticipates”, “believes”, “intends”, “estimates”, “expects” and similar expressions. The Company cautions readers that forward-looking statements, including without limitation those relating to the Company’s future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward-looking statements.
The Canadian Securities Exchange has not approved nor disapproved the contents of this news release.
Table 1
Pegmatite intercepts (> 2 m) logged in 2022 drill holes at the Corvette Property
Figure 1
2022 drill hole collar locations
Figure 2A
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2B
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2C
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2D
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2E
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2F
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
Figure 2G
Series of cross-section interpretations based on drilling to date targeting the CV5 to CV1 pegmatite corridor. Blue colour is pegmatite. Core sample assay results are pending for all 2022 pegmatite intervals.
2022 GlobeNewswire, Inc., source