PT Aneka Tambang Tbk reported production results for the first quarter ended March 31, 2022. Gold production volume from the Pongkor and Cibaliung mines posted at 370 kg (11,896 troy oz) rose to 28% from first quarter 2021 production volume of 290 kg (9,323 troy oz). Ferronickel production reached 5,681 ton of nickel in ferronickel (TNi) and Baxite commodity, in first quarter 2022 the production volume was 469,332 wmt.