RAK Ceramics (Bangladesh) Limited announced that due to the maintenance of power plant of R.A.K. Power Pvt. Ltd., a subsidiary and power supplier of RAK Ceramics (Bangladesh) Limited, the production of company will be stopped for 30 days (approximately) from December 21, 2020 as per the following schedule: Out of 4 tiles production line, Plant # 3 and Plant # 4 will completely shutdown.