Red River Resources Limited (ASX: RVR) is pleased to report record quarterly copper production from its Thalanga Operation in Northern Queensland for the quarter ended 30 September 2020 (Q1 FY21), up 51% on the copper production record it set last quarter.

With stable mine production and mill throughput during Q1, the Company produced 4,073 tonnes of copper concentrate, up from 2,696 tonnes Q4 FY20, setting a new quarterly production record. Thalanga also produced 7,026 tonnes of high-quality zinc concentrate and 1,947 tonnes of high-quality lead concentrate.

Contact:

Mel Palancian

Tel: +61 3 9017 5380

Email: mpalancian@redriverresources.com.au

Zinc Equivalent Calculation

The net smelter return zinc equivalent (Zn Eq.) calculation adjusts individual grades for all metals included in the metal equivalent calculation applying the following modifying factors: metallurgical recoveries, payability factors (concentrate treatment charges, refining charges, metal payment terms, net smelter return royalties and logistic costs) and metal prices in generating a zinc equivalent value for copper (Cu), lead (Pb), zinc (Zn), gold (Au) and silver (Ag). Red River has selected to report on a zinc equivalent basis, as zinc is the metal that contributes the most to the net smelter return zinc equivalent (Zn Eq.) calculation. It is the view of Red River Resources that all the metals used in the Zn Eq. formula are expected to be recovered and sold.

(C) 2020 Electronic News Publishing, source ENP Newswire