Renforth Resources Inc. announced the final results from its 2020/21 drill program at wholly owned Parbec open pit gold deposit located in Malartic, Quebec, adjacent to the Canadian Malartic Mine. Assay results highlights appear below, including 21.85m of 3.06 g/t gold drilled in PAR-21-141, which was drilled as an "infill" drill hole, in an area which had not previously been drilled. At the end of the program the field geologists decided to follow up on the visual results of PAR-21-141, which terminated at a vertical depth of 250m as can be seen in the vertical section below, with a shallow "overcut", PAR-21-145. As seen in the section PAR-21-141 delivered new mineralization outside of the conceptual pit shell. PAR-21-145, also delivering new mineralization, terminated at approximately 150m vertical depth, delivering highlights of 33m of 0.748 g/t gold, 19.5m of 1.09 g/t gold and 9.9m of 1.38 g/t gold. All of the assay data in these two holes is new mineralization, demonstrating continuity of mineralization at Parbec and extending mineralization to some depth. With the receipt of all assay data Renforth can now update the deposit database and update the deposit model. In addition, a structural interpretation will be carried out, all of the drilling to date, and the resource modelling, has been on the basis of grade, as opposed to a structural interpretation. With the >15,000m of new data Renforth believes an initial structural interpretation can now be completed.