RevivalGoldInc. to provide additional results from the Company’s 2021 drilling program and provide an update on exploration at the Beartrack-Arnett Gold Project (“Beartrack-Arnett”) located in Idaho, USA. Highlights: BT21-238D intersected 6.79 g/t gold over 6.0 meters and 12.6 g/t gold over 1.2 meters within 2.84 g/t gold over 50.0 meters; BT21-238D was drilled on the Joss high-grade gold target approximately 180 meters north along strike of BT21-237D, which intersected 11.79 g/t gold over 2.5 meters and 5.36 g/t gold over 5.8 meters within 84.6 meters at 2.67 g/t gold1; BT21-239DB, collared approximately 400-meters south of the southern-most drillhole at Joss, intersected a zone of fracture-controlled sericite alteration. Analysis and an interpretation are pending; A total of four core holes for 1,800 meters have been completed to-date this year at Joss; Drilling at Beartrack-Arnett is now focused with two rigs on the Haidee heap leach gold target where six holes have been completed so far this year for an additional 1,100 meters; and, 2,500 meters of drilling, including geotechnical, hydrological and approximately eleven exploration core holes, are planned to be completed in the Haidee area this Fall.