Royal Bafokeng Platinum Limited provided production guidance for the full year of 2019. The production guidance for the full year is revised to 3.9Mt -- 4.0Mt at a built-up head grade of 4.00g/t - 4.10g/t (4E) due to the slower than forecast ramp-up at Styldrift, partially compensated by increased BRPM tonnage, yielding 4E metal production of between 430koz and 440koz.