Royal Bafokeng Platinum Limited provided production guidance for the year 2020. Group production guidance for 2020, is therefore upwardly revised to be between 3.80Mt and 3.95Mt at an estimated built-up head grade of 3.98g/t (4E), yielding 405koz to 420koz (4E) metals in concentrate.