Sage Gold Inc. announced that the Company has completed its latest bulk sample mill run and fourth of 2018. Approximately 5,800 tonnes of mineralized material was shipped to the custom mill facility for processing. Production statistics including gold ounces produced, grade and mill recovery will not be known until the completion of a metallurgical reconciliation process with the custom mill facility and final refining of doré, expected to be shipped to the refiner this week. This mineralized material was extracted from the following active work areas within the Clavos underground: 100 meter level (“mL”) West: Two independent work areas striking to the west within the Footwall (“FW”) and Hanging wall (“HW”) mineralized structures. 150 mL East: Two independent work areas striking to both the east and west within both the HW and FW mineralized structures. 175 mL East: Two independent work areas striking to the east within both the HW and FW mineralized structures. 175 Longhole (“LH”) Stope: Remnant mineralized material from an existing production work area. This material was sourced from an historic St Andrew Goldfields LH stope. 200 mL East: A work area? striking to the east within the mineralized FW structure present. The Company has produced a total of 1,064 ounces of gold in the first three mill runs in 2018. The Company plans to complete a Mineral Resource and Mineral Reserve Estimate and a Pre-Feasibility study regarding the Clavos Project. In the event that a production decision is made that is not based on a Pre-Feasibility study of Mineral Reserves demonstrating economic and technical viability prepared in accordance with NI 43-101, readers are cautioned that there is increased uncertainty and higher risk of economic and technical failure associated with such production decisions.