Highlights – Drill Results from the El Domo Deposit at Curipamba:
- CURI-369 intersected 42.52 metres of 1.46% copper, 2.43 g/t gold, 0.48% zinc, 13.7 g/t silver, and 0.05% lead for 3.26% copper equivalent ("CuEq") – including 5.29 metres of 7.92% copper, 12.95 g/t gold, 2.98% zinc, 60.4 g/t silver, and 0.22% lead for 17.53% CuEq
- CURI-368 intersected 2.93 metres of 6.42% copper, 6.36 g/t gold, 30.18% zinc, 168.4 g/t silver, and 0.86% lead for 21.59% CuEq
- CURI-370 intersected 2.74 metres of 2.26% copper, 21.59 g/t gold, 36.64% zinc, 414.8 g/t silver, and 2.03% lead for 31.45% CuEq
Drill hole CURI-366 intersected semi-massive to massive sulphide mineralization from 54.40 to 55.76 metres, grading 5.20% copper, 8.03 g/t gold, 13.85% zinc, 426.5 g/t silver and 1.89% lead (18.82% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 55.76 to 57.73 metres, grading 0.28% copper, 0.69 g/t gold, 0.94% zinc, 21.9 g/t silver, and 0.12% lead (1.23% CuEq).
Drill Hole
| From (m) | To (m) | Thickness (m) | Cu (%) | Au (g/t) | Zn (%) | Ag | Pb (%) | CuEq(1) (%) | Approx. True |
CURI-366 | 54.40 | 55.76 | 1.36 | 5.20 | 8.03 | 13.85 | 426.5 | 1.89 | 18.82 | 0.95 |
55.76 | 57.73 | 1.97 | 0.28 | 0.69 | 0.94 | 21.9 | 0.12 | 1.23 | 1.38 |
(1) Metal equivalency based on |
CURI-367 intersected a narrow section of semi-massive to massive sulphide mineralization from 81.20 to 83.92 metres, grading 0.09% copper, 1.19 g/t gold, 1.22% zinc, 133.5 g/t silver and 0.64% lead (2.56% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 83.92 to 91.95 metres, grading 0.08% copper, 0.28 g/t gold, 0.81% zinc, 17.9 g/t silver, and 0.48% lead (0.78% CuEq).
Drill Hole
| From (m) | To (m) | Thickness (m) | Cu (%) | Au | Zn (%) | Ag | Pb (%) | CuEq (1) (%) | Approx. True |
CURI-367 | 81.20 | 83.92 | 2.72 | 0.09 | 1.19 | 1.22 | 133.5 | 0.64 | 2.56 | 1.77 |
83.92 | 91.95 | 8.03 | 0.08 | 0.28 | 0.81 | 17.9 | 0.48 | 0.78 | 5.22 |
(1) Metal equivalency based on |
CURI-368 intersected mineralized grainstone with massive sulphide clasts in the immediate hanging wall of the massive sulphide from 79.45 to 81.54 metres, grading 0.07% copper, 0.14 g/t gold, 0.20% zinc, 5.1 g/t silver, and 0.03% lead (0.27% CuEq). A mineralized fine-grained sediment unit occurred directly in the hanging wall of the massive sulphide mineralization from 81.54 to 83.19 metres, grading 0.30% copper, 9.75 g/t gold, 3.54% zinc, 144.1 g/t silver and 1.31% lead (9.09% CuEq). The massive sulphide mineralization was intersected from 83.19 to 86.12 metres, grading 6.42% copper, 6.36 g/t gold, 30.18% zinc, 168.4 g/t silver, and 0.86% lead (21.59% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 86.12 to 88.12 metres, grading 0.39% copper, 0.29 g/t gold, 0.83% zinc, 17.7 g/t silver, and 0.08% lead (1.01% CuEq).
Drill Hole
| From (m) | To (m) | Thickness (m) | Cu (%) | Au (g/t) | Zn (%) | Ag | Pb (%) | CuEq (1) (%) | Approx. True |
CURI-368 | 79.45 | 81.54 | 2.09 | 0.07 | 0.14 | 0.20 | 5.1 | 0.03 | 0.27 | 1.67 |
81.54 | 83.19 | 1.65 | 0.30 | 9.75 | 3.54 | 144.1 | 1.31 | 9.09 | 1.32 | |
83.19 | 86.12 | 2.93 | 6.42 | 6.36 | 30.18 | 168.4 | 0.86 | 21.59 | 2.34 | |
86.12 | 88.12 | 2.00 | 0.39 | 0.29 | 0.83 | 17.7 | 0.08 | 1.01 | 1.60 |
(1) Metal equivalency based on |
CURI-369 was an attempted re-drill of CURI-364, however, it was also terminated in the same fault zone. It intersected mineralized grainstone in the hanging wall of the massive sulphide mineralization from 106.00 to 107.11 metres, grading 0.46% copper, 1.66 g/t gold, 0.59% zinc, 11.2 g/t silver and 0.06% lead (1.80% CuEq). Massive sulphide mineralization was intersected from 107.11 to 149.63 metres, grading 1.46% copper, 2.43 g/t gold, 0.48% zinc, 13.7 g/t silver and 0.05% lead (3.26% CuEq). A higher-grade subset occurs from 107.11 to 112.40 metres, grading 7.92% copper, 12.95 g/t gold, 2.98% zinc, 60.4 g/t silver and 0.22% lead (17.53% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 149.63 to 153.51 metres, grading 0.10% copper, 0.36 g/t gold, 0.03% zinc, and 9.6 g/t silver (0.42% CuEq)
Drill Hole
| From (m) | To (m) | Thickness (m) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | Pb (%) | CuEq (1) (%) | Approx. True |
CURI-369 | 106.00 | 107.11 | 1.11 | 0.46 | 1.66 | 0.59 | 11.2 | 0.06 | 1.80 | 0.83 |
107.11 | 149.63 | 42.52 | 1.46 | 2.43 | 0.48 | 13.7 | 0.05 | 3.26 | 31.89 | |
including | 107.11 | 112.40 | 5.29 | 7.92 | 12.95 | 2.98 | 60.4 | 0.22 | 17.53 | 3.97 |
149.63 | 153.51 | 3.88 | 0.10 | 0.36 | 0.03 | 9.6 | 0.00 | 0.42 | 2.91 |
(1) Metal equivalency based on |
CURI-370 intersected mineralized grainstone in the hanging wall of the massive sulphide mineralization from 55.52 to 58.07 metres, grading 0.04% copper, 0.85 g/t gold, 2.65% zinc, 68.7 g/t silver, and 1.02% lead (2.24% CuEq). Massive sulphide mineralization was intersected from 59.50 to 62.24 metres, grading 2.26% copper, 21.59 g/t gold, 36.64% zinc, 414.8 g/t silver, and 2.03% lead (31.45% CuEq). Two sections of mineralized footwall felsic autoclastic volcanic rocks were intersected from 62.24 to 65.50 metres and 79.65 to 82.54 metres. The first intercept graded 0.16% copper, 0.54 g/t gold, 1.16% zinc, and 16.2 g/t silver, and 0.06% lead (1.03% CuEq) and the second intercept graded 1.13% copper, 0.08 g/t gold, 0.05% zinc, and 3.6 g/t silver (1.23% CuEq).
Drill Hole
| From (m) | To (m) | Thickness (m) | Cu (%) | Au (g/t) | Zn (%) | Ag | Pb (%) | CuEq (1) (%) | Approx. True |
CURI-370 | 55.52 | 58.07 | 2.55 | 0.04 | 0.85 | 2.65 | 68.7 | 1.02 | 2.24 | 1.66 |
59.50 | 62.24 | 2.74 | 2.26 | 21.59 | 36.64 | 414.8 | 2.03 | 31.45 | 1.78 | |
62.24 | 65.50 | 3.26 | 0.16 | 0.54 | 1.16 | 16.2 | 0.06 | 1.03 | 2.12 | |
79.65 | 82.54 | 2.89 | 1.13 | 0.08 | 0.05 | 3.6 | 0.00 | 1.23 | 1.88 |
(1) Metal equivalency based on |
All results from the current infill definition drilling program will be used to update the Mineral Resource estimate for the El Domo deposit in 2021. The updated Mineral Resource estimate will be part of the ongoing feasibility study for the development of the El Domo deposit (see
For reference, the last NI 43-101 Mineral Resource estimate for
Technical Information and Quality Control & Quality Assurance ("QAQC")
The Curipamba project work program is being managed and reviewed by Vice President Exploration,
Qualified Person
The technical information of this news release has been reviewed and verified as accurate by Mr.
About Adventus
About Salazar
Neither the
This press release contains "forward -looking information" within the meaning of applicable Canadian securities laws. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as "believes", "anticipates", "expects", "is expected", "scheduled", "estimates", "pending", "intends", "plans", "forecasts", "targets", or "hopes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "will", "should" "might", "will be taken", or "occur" and similar expressions) are not statements of historical fact and may be forward-looking statements.
Forward-looking information herein includes, but is not limited to, statements that address activities, events, or developments that Adventus and Salazar expect or anticipate will or may occur in the future. Although Adventus and Salazar have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Adventus and Salazar undertake to update any forward-looking information except in accordance with applicable securities laws.
For further information from Salazar, please contact ir@salazarresources.com.
Table 1: Drill Collar Information for Infill Drill Holes at El Domo
Hole ID | EAST | NORTH | ELEV | AZIMUTH | DIP | DEPTH | COMMENT |
CURI-391 | 655001 | 9854898 | 882 | 165 | -65 | 70.6 | Successfully completed per design |
CURI-390 | 695109 | 9855451 | 953 | 170 | -79 | 137.7 | Successfully completed per design |
CURI-389 | 694999 | 9855351 | 908 | 338 | -70 | 64.5 | Successfully completed per design |
CURI-388 | 695051 | 9855474 | 930 | 165 | -50.6 | 143.0 | Successfully completed per design |
CURI-387 | 695051 | 9855474 | 930 | 26 | -49 | 112.3 | Successfully completed per design |
CURI-386 | 695100 | 9855600 | 943 | 230 | -65 | 90.2 | Successfully completed per design |
CURI-385 | 695094 | 9855482 | 940 | 45 | -54 | 128.0 | Successfully completed per design |
CURI-384 | 695054 | 9855642 | 923 | 136 | -54 | 110.6 | Successfully completed per design |
CURI-383(1) | 695373 | 9855400 | 995 | 270 | -65 | 210.4 | Successfully completed per design |
CURI-382 | 695094 | 9855482 | 940 | 64 | -48 | 156.5 | Successfully completed per design |
CURI-381 | 695214 | 9855602 | 949 | 197 | -57 | 154.4 | Successfully completed per design |
CURI-380(1) | 695375 | 9855000 | 1030 | 270 | -70 | 250.1 | Successfully completed per design |
CURI-379 | 695094 | 9855482 | 940 | 167 | -48 | 153.8 | Successfully completed per design |
CURI-378 | 695054 | 9855122 | 893 | 181 | -57 | 113.1 | Successfully completed per design |
CURI-377 | 695054 | 9855122 | 893 | 55 | -51 | 92.3 | Successfully completed per design |
CURI-376(1) | 695361 | 9855100 | 1087 | 270 | -70 | 275.4 | Successfully completed per design |
CURI-375(1) | 695333 | 9855200 | 1057 | 270 | -75 | 250.1 | Successfully completed per design |
CURI-374 | 695006 | 9855134 | 883 | 296 | -45 | 120.6 | Successfully completed per design |
CURI-373 | 695094 | 9855482 | 940 | 103 | -48 | 197.0 | Successfully completed per design |
CURI-372 | 695041 | 9854913 | 888 | 38 | -45 | 106.3 | Successfully completed per design |
CURI-371(1) | 695399 | 9855298 | 1016 | 270 | -65 | 225.7 | Successfully completed per design |
CURI-370 | 695040 | 9854913 | 888 | 231 | -74 | 86.2 | Successfully completed per design |
CURI-369 | 695094 | 9855482 | 940 | 142 | -48 | 168.7 | Successfully completed per design |
CURI-368 | 695041 | 9854913 | 888 | 331 | -58 | 113.6 | Successfully completed per design |
CURI-367 | 695006 | 9855134 | 883 | 196 | -45 | 102.2 | Successfully completed per design |
CURI-366 | 694975 | 9854918 | 872 | 186 | -72 | 74.5 | Successfully completed per design |
CURI-365 | 694934 | 9855242 | 874 | 151 | -72 | 69.5 | Successfully completed per design |
CURI-364-A | 695131 | 9855402 | 946 | 108 | -60 | 121.8 | Successful but lost in fault zone |
CURI-364 | 695134 | 9855402 | 946 | 108 | -60 | 130.4 | Successful but lost in fault zone |
CURI-363 | 694934 | 9855242 | 874 | 180 | -54 | 95.0 | Successfully completed per design |
CURI-362 | 694975 | 9854918 | 872 | 288 | -61 | 88.9 | Successfully completed per design |
CURI-361 | 695134 | 9855402 | 946 | 75 | -54 | 172.8 | Successfully completed per design |
CURI-360 | 694934 | 9855242 | 874 | 25 | -48 | 83.0 | Successfully completed per design |
CURI-359 | 695006 | 9855134 | 883 | 349 | -69 | 86.5 | Successfully completed per design |
CURI-358 | 694934 | 9855082 | 867 | 255 | -54 | 113.0 | Successfully completed per design |
CURI-357 | 695057 | 9855149 | 894 | 229 | -74 | 105.0 | Successfully completed per design |
CURI-356 | 695006 | 9855134 | 883 | 241 | -77 | 110.6 | Successfully completed per design |
CURI-355 | 695057 | 9855149 | 894 | 36 | -45 | 86.3 | Successfully completed per design |
CURI-354 | 695057 | 9855149 | 894 | 55 | -54 | 81.0 | Successfully completed per design |
CURI-353 | 695094 | 9855122 | 908 | 192 | -45 | 97.4 | Successfully completed per design |
CURI-352 | 695057 | 9855149 | 894 | 306 | -77 | 78.0 | Successfully completed per design |
CURI-351 | 695057 | 9855149 | 894 | 338 | -59 | 77.0 | Successfully completed per design |
CURI-350 | 695094 | 9855122 | 908 | 180 | -57 | 85.7 | Successfully completed per design |
CURI-349 | 695094 | 9855122 | 908 | 263 | -51 | 130.2 | Successfully completed per design |
CURI-348 | 695094 | 9855082 | 910 | 276 | -45 | 135.1 | Successfully completed per design |
CURI-347 | 695094 | 9855082 | 910 | 105 | -54 | 91.0 | Successfully completed per design |
CURI-346 | 695094 | 9855082 | 910 | 52 | -69 | 83.4 | Successfully completed per design |
CURI-345 | 695094 | 9855082 | 910 | 142 | -48 | 95.7 | Successfully completed per design |
CURI-344 | 695094 | 9855082 | 910 | 360 | -60 | 84.1 | Successfully completed per design |
CURI-343 | 695094 | 9855082 | 910 | 192 | -45 | 142.0 | Successfully completed per design |
CURI-342 | 695041 | 9854913 | 888 | 346 | -45 | 137.1 | Successfully completed per design |
CURI-341 | 695134 | 9854922 | 917 | 360 | -60 | 117.4 | Successfully completed per design |
CURI-340 | 695134 | 9854922 | 917 | 360 | -45 | 149.0 | Successfully completed per design |
Notes:
(1) Geomechanical drill hole for open pit engineering design purposes only; being drilled in addition to the Infill program
(2) All drill holes are surveyed in UTM Datum (Provisional South American 1956, Zone 17)
SOURCE
© Canada Newswire, source