Shree Minerals Limited announced Aircore drilling planned for approximately 98 holes for approximately 5000 to 6000 metres to test the identified lithium pegmatite potential and gold anomalies, in the southern portion of the tenement E63/2046. Contract finalised with Gyro Drilling. Heritage Survey Clearance Report received.

POW approval received. Drilling expected to commence in November 2022. Heritage Survey tentatively scheduled by NNTAC for 3rd week of November 2022 at E63/2048: To progress exploration plans for in-fill of the historical 1 km spaced soil sample traverses in E63/2048 with a powered auger to define and prioritise targets for RAB and RC drilling.

Exploration licences (E63/2046 & E63/2048) in the Albany Fraser Orogen (AFO) are interpreted to occur along strike of the well-endowed Boulder Lefroy Fault Zone (BLFZ) and the Zuleika Shear (ZS). World class lithium in pegmatite deposits are spatially related to these mineralised structures to the north of Shree's tenure. Pegmatites have been recorded from historical drill logs proximal to these structures within E63/2046.

Mapping identified historical drill hole spoils containing pegmatite chips. Historical drilling intersections up to 3 g/t Au remain open and the associated soil geochemistry suggests the mineralisation is much more extensive than indicated by drilling.