Sibanye Stillwater Limited provided operating guidance for the year 2021. For the year, the 2E PGM production forecast from the US PGM operations has been revised to between 620,000 2Eoz and 650,000 2Eoz, with AISC of between USD 910/2Eoz to USD 940/2Eoz. 4E PGM production from the SA PGM operations for 2021 is forecast to be between 1,750,000 4Eoz and 1,850,000 4Eoz with AISC between ZAR 18,500/4Eoz and ZAR 19,500/4Eoz (USD 1,230/4Eoz and USD 1,295/4Eoz). Gold production from the SA gold operations for 2021 is forecast at between 27,500 kg (884,000 oz) and 29,500 kg (948,000 oz) with AISC of between ZAR 815,000/kg and ZAR 840,000/kg (USD 1,690/oz and USD 1,742/oz, revised higher due to higher electricity tariffs and other above inflation costs.