Sihayo Gold Limited announced encouraging gold intercepts returned in early assay results received within nine holes completed in a planned 20 hole (2,000 m) diamond drilling program at the Sihayo-2 prospect located in the northern block of the PT Sorikmas Mining Contract of Work, North Sumatra, Indonesia. There is potential to add value to the existing Sihayo Starter Project, for which a Definitive Feasibility Study was completed in June 2020, through the discovery of additional gold resources within trucking distance of the Sihayo-1 and Sambung sedimentary rock-hosted disseminated gold deposits. The prime exploration targets occur within two subparallel mineralised trends that were identified in previous exploration work, Sihayo-1/2 - Sambung - Hutabargot Julu and Sihayo-3/4/5. These two mineralised trends define the the Sihayo gold belt. Sihayo-2 prospect lies on the open northwest projection and between 500-1,000 m distance from the Sihayo gold deposit Figure 2. It contains a strong concentration of jasperoid1 boulders and outcrops located along a narrow NW-SE oriented ridgeline and down the eastern slope into a deeply eroded valley, which is the proposed Northern waste dump location. The area is further highlighted by untested gold soil and coincident IP chargeability anomalies generated in historic exploration work programs. Drilling at Sihayo-2 commenced in mid-March 2021 and is targeting potential for additional gold resources located close to the Sihayo Starter Mine development. This is a 2,000 metre program over 20 holes. Drilling is well in progress and expected to take another 1-2 months to complete the first stage of drilling.