Subsea 7 S.A. announced the award of a substantial project for subsea installation services related to Beacon Offshore Energy LLC's Shenandoah Development, located offshore Gulf of Mexico in water depths up to 6,300 feet. The project covers the tie-back of four subsea wells to the Shenandoah host facility through a subsea manifold with dual flowlines and risers. The work scope includes engineering, procurement, construction, installation (“EPIC”) and commissioning of the subsea equipment including structures, umbilicals, and production and gas export flowlines.

Subsea 7's scope also includes the wet tow and hook-up of the semi-submersible FPS to the field and mooring system installation. Project management and engineering will commence immediately at Subsea 7's offices in Houston, Texas. Fabrication of the flowlines and risers will take place at Subsea 7's spoolbase in Ingleside, Texas, with offshore operations scheduled for 2024.