Investor Information

SUPPLEMENTAL

Published May 9, 2022

Table of Contents

1.

Energy Sources

  • 2. Processing, Infrastructure & Logistics

  • 3. Consumer Channels

  • 4. Sustainability

  • 5. Energy Expansion

  • 6. Technology Development

  • 7. Integrated Model Calculation

  • 8. Glossary

EAnpepregnydix Sources

202003-038

Oil Sands Energy Sources

*All values net to Suncor

In Situ

Firebag

215,000 bpd capacity Suncor WI 100% 2,686 mmbbls 2P reserves1

MacKay River

38,000 bpd capacity Suncor WI 100% 486 mmbbls 2P reserves1

1, 2 See Slide Notes and Advisories.

Future opportunities2

ES-SAGD Firebag Expansion Lewis (SU WI 100%) Meadow Creek (SU WI 75%)

Mining

Base Plant

350,000 bpd capacity Suncor WI 100% 1,158 mmbbls 2P reserves1

Note: Millennium and North Steepbank Mines do not supply full 350,000 bpd of capacity as significant in situ volumes are sent through Base Plant

Syncrude

Suncor assumed operatorship on Sept 30, 2021 205,600 bpd net coking capacity Suncor WI 58.74% 981 mmbbls 2P reserves1

Fort Hills

Suncor operated 105,000 bpd net capacity Suncor WI 54.11% 1,248 mmbbls 2P reserves1

Long life, low decline reserves base

Illustrative annual AFFO2 profiles3

Typical attributes1 of North American oil plays

Initial capitalDecline rate

Medium

In SituOffshore

~10% of Suncor's 2022 production guidance

Medium

Tight Oil

50 Years

Sustaining costs

Medium

Beneficial attributeChallenging attribute

1, 2, 3 See Slide Notes and Advisories

Operating cost

MediumMedium

Reservoir riskRecovery factor

MediumMedium

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Suncor Energy Inc. published this content on 09 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 09 May 2022 23:53:06 UTC.