Fracture stimulation of Tanumbirini 2H ("T2H") and T3H wells has commenced, with initial flow test results expected in
"Tamboran announces that the CY2021 drilling program in EP 161 has been completed by our joint venture partner
"Importantly, the CY2021 drilling program was conducted safely and without incident, a testament to the excellent leadership and unwavering commitment to health, safety and environment by the rig crew.
"The EP 161 joint venture will now test the productivity of each well, with approximately 10 stages of fracture stimulations per well in the target formation of the Mid-Velkerri 'B'. Initial flow test results are expected in
"The CY2021 drilling program in EP 161 has provided Tamboran with key learnings and knowledge that we intend to incorporate into the drilling of the 100% owned and operated Maverick 1H, located in EP 136, during CY2022."
About
Contact:
Investor enquiries:
+61 2 8330 6626
Investors@tamboran.com
Media enquiries:
+61 2 8330 6626
Media@tamboran.com
Copyright (C) 2021 ABN Newswire. All rights reserved., source