Log in
E-mail
Password
Show password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
New member
Sign up for FREE
New customer
Discover our services
Settings
Settings
Dynamic quotes 
OFFON
  1. Homepage
  2. Equities
  3. Australia
  4. Australian Stock Exchange
  5. Theta Gold Mines Limited
  6. News
  7. Summary
    TGM   AU0000035701

THETA GOLD MINES LIMITED

(TGM)
  Report
End-of-day quote. End-of-day quote Australian Stock Exchange - 12/03
0.18 AUD   +2.86%
11/29THETA GOLD MINES : 2021 Q3 Quarterly Cashflow Report
PU
11/29THETA GOLD MINES : 2021 Q3 Quarterly Activities Report
PU
11/29THETA GOLD MINES : 2021 fy
PU
SummaryChartsNewsCalendarCompanyFinancials 
SummaryMost relevantAll NewsOther languagesPress ReleasesOfficial PublicationsSector news

Theta Gold Mines Limited Plans to Commence At the TGME Underground Project over the Second Half Calendar Year of 2021

08/10/2021 | 07:32pm EST

Theta Gold Mines Limited provided an update on the development work that is planned to commence at the TGME Underground Project over the second half calendar year of 2021. The work program largely comprises the upgrading of the Maiden Underground Prefeasibility Study to a Definitive Feasibility Study and commencement of trial mining. HIGHLIGHTS: Trial Mining, DFS and Resource upgrade: Definitive Feasibility Studies are to be completed for Beta, Frankfort, CDM and Rietfontein underground mines, completion is expected by the second quarter of 2022. The historic Frankfort mine (last operated in 2014) will be reopened during the quarter where trail mining will commence on the Frankfort Bevetts reef. Trial mining will focus on drilling and blasting techniques in order to refine the long-hole open stoping mining method; No development is necessary in order to undertake the trail mining as the stopes are easily accessible through the existing horizontal adits and old mine development; A mechanical Boart Longyear S36 drill rig will be utilized to drill the blast holes; The Theta team will work with several reputable explosives suppliers in order to participate in the explosive trail of pumpable emulsion explosives. An additional study will be commenced to identify, sample and test numerous surface sources of historic waste and tailings dumps which are believed to contain payable limits of gold. A planned underground exploration drilling program is to be undertaken at the Beta North, Frankfort and Rietfontein mines. The Beta Mine South section is to be sampled from underground. Further metallurgical test work will continue on both Frankfort and Beta mines. Environmental, Social & Governance (ESG): Permitting activities to focus on the updating of the Mine Works Program and complete the biodiversity studies in order to strengthen the mining rights' and environmental authorisation application process. In support of the permitting and legislative applications the detailed engineering design for the integrated waste management system, focusing on waste classification to final tailing dam design, will be completed. The stakeholders engagement process will commence during this period and include access agreements with landowners. Kongiwe environmental engagement specialists will be appointed to assist with this project activity. Summary: On-site focus will be on mine pre-production activities and resource upgrading work that is expected to be completed within the next 6 months. The recent funding will enable the progress of the phase 1 underground project that includes Beta, CDM, Frankfort and Rietfontein mines. Minxcon will be appointed as the Mine design engineers for the phase 1 underground project with a Definitive Feasibility Study completed by second quarter of 2022. The inclusion of the Rietfontein Mine into the DFS is likely to give this mine its first ore Reserve and lead to an updated Resource Statement for the Company. The planned trail mining at the Frankfort Mine will consist of long-hole mechanised mining utilizing modern underground mining methods and technologies. The initial drill holes will be drilled with a Boart Longyear S36 drill rig. Various South African explosive suppliers will participate in the explosive trails of pumpable emulsion explosives. The trail mining data (drill hole size, drill pattern and explosive charge rate, etc.) will inform the DFS and provide proof of concept. The exploration of the Beta Mine South section has initiated. This will include sampling and mapping of the reef within the old stopes and development ends. The initial sampling of this section of the mine will consist of a 12 meter sampling gride which will add to the existing Resource Tables. The Theta Environmental Social Governance program will be progressed with the continuation of environmental studies and engineering designs as part of the Environmental Management Plan. The license to operate project will be future strengthened with the appointment of Kongiwe environmental engagement specialists to lead the stakeholder engagement program. As part of the current biodiversity studies, a land compensation strategy and catchment rehabilitation plan will be tabled. Environmental rehabilitation will continue with old mining footprint cleanups at the Beta Mine North and the site preparation of the old process plant, which may entail the demolition of old and unnecessary equipment. These environmental activities will be performed using local community enterprises. Engineering work on the tailing dam extension and final design will be completed by fourth quarter of 2021. This engineering design of the tailings dam, subject to final approval, should firm up the initial tailings capacity to 2.1 million tons. The tailings dam will have a life of mine of 9 years and support the current phase 1 underground project.


ę S&P Capital IQ 2021
All news about THETA GOLD MINES LIMITED
11/29THETA GOLD MINES : 2021 Q3 Quarterly Cashflow Report
PU
11/29THETA GOLD MINES : 2021 Q3 Quarterly Activities Report
PU
11/29THETA GOLD MINES : 2021 fy
PU
11/11Theta 2021 AGM Materials
PU
11/09Theta Gold Mines Limited Appoints Byron Dumpleton as Non-Executive Director
CI
11/09Theta Gold Mines Limited New Board Appointments
AW
10/31Theta Gold Mines Limited Quarterly Activities Report
AW
10/31Theta Gold Mines Limited Auditor Raises 'Going Concern' Doubt
CI
10/24Theta Gold Mines Limited Project Permitting Update
AW
10/24Theta Gold Mines Limited Updates on Permitting of the TGME Underground Project
CI
More news
Financials (USD)
Sales 2021 - - -
Net income 2021 -4,37 M - -
Net Debt 2021 7,14 M - -
P/E ratio 2021 -24,6x
Yield 2021 -
Capitalization 66,2 M 66,4 M -
EV / Sales 2020 -
EV / Sales 2021 -
Nbr of Employees -
Free-Float 45,6%
Chart THETA GOLD MINES LIMITED
Duration : Period :
Theta Gold Mines Limited Technical Analysis Chart | MarketScreener
Full-screen chart
Income Statement Evolution
Managers and Directors
George Jenkins Chief Executive Officer
Charles William Guy Executive Chairman
Johan Fourie Manager-Group Compliance
Yang Liu Non-Executive Director
Bill Richie Yang Non-Executive Director
Sector and Competitors