Trans Canada Gold Corp. announced that it has now received permit approval for Planned Mineral Exploration Work from the Government of Newfoundland and Labrador, for Trans Canada Gold's Crippleback Lake Gold property situated in the "Corridor of Gold", in Central Newfoundland. The newly issued exploration permit now grants permission to follow up on gold targets recently identified by Sokomon Minerals (TSXV-SIC), which will quickly bring the project to the drill ready stage. The exploration permit allows for prospecting, geochemical sampling, airborne geophysics and ground geophysics. In addition to Exploration permitting, drilling permits were recently submitted on June 17, 2021 for diamond drilling and the use of heavy equipment, once gold targets have been fully defined on the property in the coming months. The Company is positioned to move quickly, and to advance the gold potential of this centrally positioned gold property, which lies directly over the Cape Ray Faulting system, the same faulting system, which also hosts the Marathon Valentine Lake Gold deposit and the Sokomon Minerals Moosehead 100% wholly-owned Gold discovery located in Central Newfoundland's Corridor of Gold. The Crippleback Lake Gold Project covers the northeastern extension of the regional scale Valentine Lake fault/Shear zone and is situated in the same geological units that host high grade gold mineralization at Marathon's Gold's Valentine Lake gold deposit. The property is situated in the gold prolific and rapidly emerging Corridor of gold in the Central Newfoundland Gold Belt, and is ideally situated on trend with Sokoman's flagship Moosehead High-Grade Gold discovery which is now in the midst of Phase 6 of a 50,000-metre (Phase 6) drill program. The Crippleback Lake Gold property is located near the Trans- Canada highway in north-central Newfoundland, is easily accessible by a network of secondary logging roads and is only a short drive from assaying and diamond drilling services in Springdale, Newfoundland. 121 mineral claims (3025 ha or 7475 acre) fully road accessible from the TransCanada Highway with numerous secondary logging roads internal to the claims. Covers a 13-kilometre strike length of the gold rich Valentine Lake Structural Zone midway between Marathon Gold's Valentine Lake Gold Deposit and Sokoman Minerals 100% wholly- owned high-grade gold Moosehead Discovery. Robust Gold in lake sediment and till samples, with multiple till samples exhibiting delicate (proximal to source) gold grains as well as angular float samples assaying up to 1.7 g/t gold. All previous exploration efforts focused on base metals. Exploration Permits have been approved by the Government of Newfoundland and Labrador. Drilling Permits have been submitted on June 17, 2021.