Turquoise Hill Resources Ltd. provided production guidance for the year 2022 for Oyu Tolgoi. For the year, Oyu Tolgoi is expected to produce 110,000 to 150,000 tonnes of copper and 115,000 to 165,000 ounces of gold in concentrates from processing of open pit and underground development material as well as stockpiles. Gold and copper production is forecast to be lower in 2022 vs 2021 due to stripping of the next cutback and processing lower grade stockpile material.