List of Assets
December 2020
Well-diversified International generation portfolio
Net capacity by country and fuel type (GW)1
Net capacity by fuel type (GW)1
HydroNuclearHard CoalGas
Note: Deviations may occur due to rounding
Other
1. Net capacity as of 31st December 2020 (accounting view)
Lignite
2
European Generation
Asset Overview and Asset List
Asset overview
Overview - Capacity development, MW1
2020 Accounting view 2019 Accounting view | 2020 Pro rata view 2019 Pro rata view | |
Hydro Germany Sweden | 1,991 1,991 1,579 1,579 | 1,927 1,927 1,771 1,771 |
Nuclear Sweden | 1,400 1,400 | 1,996 1,988 |
Hard coal Germany UK Netherlands | 3,954 2,902 2,000 2,000 1,070 1,070 | 3,954 2,902 2,000 2,000 1,070 1,070 |
Lignite Germany | 900 900 | 500 500 |
Gas Germany Sweden UK Netherlands Hungary | 3,333 3,333 449 447 4,180 4,188 525 526 428 428 | 2,912 2,912 449 447 4,180 4,188 525 526 428 428 |
Other2 Germany Sweden UK | 1,418 1,418 1,162 1,162 221 221 | 1,418 1,418 1,162 1,162 221 221 |
Total3 | 24,610 23,565 | 24,513 23,460 |
Note: Totals shown are exact figures - deviations possible due to rounding.
1. Generation capacity is reported for plants if plants were in operation at end of 2020.
2. Other includes Renewables, Biomass, Fuel Oil.
3. Excluding net generation capacities from Hydro LTCs in Austria and Switzerland of 564 MW in 2019 and 514 MW in 2020.
Asset overview (cont'd)
Overview - Electricity production (Accounting view), TWh1
2020
2019
Germany Sweden
5.299 5.399
Hydro
8.443 7.310
Nuclear
Sweden Germany UK France Netherlands
8.009
11.020
7.479 5.641
0.459 0.744
Hard coal
- 0.319
4.736 3.133
Lignite
Germany Germany Sweden UK France Netherlands Hungary
2.512
3.618
2.387 0.865
0.017 0.006
10.408 13.185
Gas
- 1.912
1.456 1.788
2.226 2.559
Other Total
France
- 53.432
0.096 57.597
Note: Totals shown are exact figures - deviations possible due to rounding. 1. Accounting view.
Asset overview (cont'd)
Overview - Net electricity generation sales (pro rata view), TWh1
2020
2019
Germany Sweden
4.334 5.305
Hydro
9.432 8.151
Nuclear
Sweden Germany UK France Netherlands
11.480
16.745
6.238 5.715
0.396 0.690
Hard coal
- 0.319
4.698 3.108
Lignite
Germany Germany UK France Netherlands Hungary
2.144
3.618
1.914 0.852
10.248 13.025
Gas
- 2.008
1.456 1.788
2.225 2.559
Other Total
France
- 54.564
0.096 63.979
Note: Totals shown are exact figures - deviations possible due to rounding.
1. Pro rata view; Net electricity generation volumes = Owned generation - own use losses - sales to minority owners + purchases from minorities.
Details on the German power plant portfolio
Hydro - Storage
Walchensee
Roßhaupten
Hemfurth
HelminghausenConsolidated
Consolidated
Consolidated
Consolidated
Total
Hydro - Pumped storage
124 50 20 1
195
Site
Consolidation
Capacity (technical, MW)
Waldeck II
Langenprozelten
Happurg1
Waldeck I2
Consolidated
Consolidated
Consolidated
Consolidated
480 100.00% 1974
164 77.66% 1976
160 100.00%
145 100.00%
100.00 % 1924
Hungary | ||
Pro-rata | Accounting | |
(MW) | (MW) | |
124 | 124 | |
46 | 46 | |
20 | 20 | |
1 | 1 | |
191 | 191 | |
Pro-rata | Accounting | |
(MW) | (MW) | |
480 | 480 | |
127 | 164 | |
1958/1963/1965 | 160 | 160 |
1931/1933/2009 | 145 | 145 |
100.00 % 1954
100.00 % 100.00 %
1915/1994
1924
Stake
COD
Note: Plants shown include those plants that were in operation at end of 2020.
1. Happurg facility mothballed in 2016.
2. Includes also Bringhausen.
Hydro - Pumped storage (cont'd)
Oberberg
Consolidated
9
1960/1985
9 9
Total
958
921 958
Hydro - Run-of-river
Site
Consolidation
Capacity (technical, MW)
Pro-rata
Stake
Accounting
COD
(MW)
(MW)
Kachlet Aufkirchen Eitting Geisling Bergheim Vohburg Pfrombach Straubing
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
56
77.49%
1927
42 54
38
100.00%
1924
27 27
36
100.00%
1925
26 26
26
19 25
24
18 24
23
18 23
24
22 22
22
17 22
Hydro - Run-of-river (cont'd)
Bittenbrunn Ingolstadt Prem Bertoldsheim Altheim Kaufering Dornau Gummering Niederaichbach Dingolfing Obernach Ettling Landau Pielweichs
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
20
16 20
20
15 20
22
19 19
19
15 19
18
18 18
18
17 17
18
17 17
17
17 17
18
16 16
18
15 15
16
13 13
13
13 13
13
13 13
13
1994
13 13
Hydro - Run-of-river (cont'd)
Oberpeiching Unterbergen Scheuring Prittriching Merching Schwabstadl Mühltal Rain Dessau Urspring Ellgau Kleinostheim Feldheim Epfach
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
13
10 13
14
12 12
14
12 12
12
12 12
14
12 12
13
12 12
13
11 11
12
9 12
13
10 10
12
10 10
11
8 11
10
8 10
9
7 9
8
1948
8 8
Hydro - Run-of-river (cont'd)
Dornstetten Kinsau Lechblick Finsing Lechmühlen Pitzling Landsberg Finsterau Apfeldorf Regensburg Sperber Bad Abbach Ottendorf Viereth
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
8
8 8
8
8 8
8
8 8
8
8 8
8
8 8
8
8 8
8
8 8
8
8 8
7
7 7
8
6 7
7
7 7
6
5 6
7
5 6
7
1925/1983
5 6
Hydro - Run-of-river (cont'd)
Gottfrieding TW Schönmühl Kesselstadt Gottfrieding Freudenberg Dettelbach Rothenfels Steinbach Faulbach Haag Offenbach Pullach Garstadt Hirschaid
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
5
5 5
5
5 5
1921/1986
6
5 5
5
3 4
4
3 4
7
6 6
4
3 4
4
3 4
1923/1991
4
4 4
5
4 4
4
3 4
5
1923
4 4
Hydro - Run-of-river (cont'd)
Limbach Abbach TW Heubach Wallstadt Obernau Eichel Höllriegelskreuth Klingenberg Harrbach Kitzingen Knetzgau Wipfeld Forchheim Erlabrunn
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
4
3 4
4
3 4
4
3 3
4
3 3
3
3 3
3
2 3
1894/1940
3
2 3
3
2 3
3
2 3
3
2 3
3
2 3
3
2 3
3
1934
2 3
Hydro - Run-of-river (cont'd)
Lengfurt Himmelstadt Gerlachshausen Regensburg TW Niedernach Marktbreit Goßmannsdorf Randersacker Hausen Volkach Speicherseekraftwerk Klein Kinsau Oberföhring Untere Mainmühle
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
3
2 3
3
2 3
3
2 2
2
2 2
2
2 2
2
2 2
2
2 2
2
2 2
2
2 2
2
1 2
2
1 1
2
1 1
1
1 1
1
1924/1988
1 1
Hydro - Run-of-river (cont'd)
Dietfurt TW
Finsing Bachsammler Kesselbach
Krün Lochbach Neuses Hallerndorf Happach Kaupersberg Altenstadt Au Dillingen Donauwörth Faimingen
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated
1
0 1
0
0 0
0
0 0
0
0 0
0
0 0
0
0 0
0
0 0
0
0 0
0
0 0
1
0 0
10
6 0
8
4 0
9
4 0
10
1965
5 0
Hydro - Run-of-river (cont'd)
Gundelfingen Günzburg Höchstädt Leipheim Oberelchingen Offingen Schweinfurt Schwenningen Untereichen
Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated
8
4 0
9
4 0
11
5 0
10
5 0
10
5 0
8
4 0
4
2 0
9
4 0
10
6 0
Total
1,027
815 842
Note: Plants shown include those plants that were in operation at end of 2020. 16
Hard coal
Datteln Heyden Wilhelmshaven Staudinger 5 Scholven B Scholven C Scholven FWK Buer Kiel
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Not consolidated
1,052
1,052 1,052
875
875 875
757
757 757
510
510 510
345
345 345
345
345 345
138
70 70
0
0 0
Total
3,954
3,954
3,954
Lignite
Site
Consolidation
Capacity (technical, MW)
Pro-rata
Stake
Accounting
COD
(MW)
(MW)
Schkopau A+B Total
Consolidated
900 900
500 900
500 900
Gas
Irsching 5
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
846
425 846
Staudinger 4
622
622 622
Irsching 4
561
561 561
Franken I/2
440
440 440
Franken I/1 Huntorf Kirchmöser
383
383 383
321
321 321
178
160 160
Total
3,351
2,912 3,333
Other
Irsching 3
Pleinting 21
Ingolstadt 3
Ingolstadt 4
Pleinting 11 Kiel/Audorf Kiel/Itzehoe Wilhelmshaven GT
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
415
415 415
0
0 0
386
386 386
386
386 386
0
0 0
87
87 87
88
88 88
56
56 56
Total
1,418
1,418 1,418
Note: Plants shown include those plants that were in operation at end of 2020. 1. Pleinting 1 and Pleinting 2 facility mothballed in 2016.
Details on the UK power plant portfolio
Hard coal
Ratcliffe U1 Ratcliffe U2 Ratcliffe U3 Ratcliffe U4 Total
Consolidated Consolidated Consolidated Consolidated
500 500 500 500 2,000
100.00% 100.00% 100.00% 100.00%
1967 1968 1969 1970
2,000 2,000
Gas
Site
Consolidation
Capacity (technical, MW)
Pro-rata
Stake
Accounting
COD
(MW)
(MW)
Grain 6
Grain 7
Grain 8
Killingholme Mod 11
Killingholme Mod 22
Consolidated Consolidated Consolidated Consolidated Consolidated
441
441 441
441
441 441
441
441 441
300
300 300
300
300 300
Note: Plants shown include those plants that were in operation at end of 2020.
1. Killingholme 1 and 2 have been converted from CCGT to OCGT mid 2016 by reducing total capacity of both units from 900MW to 600MW.
Gas
Consolidation
Enfield
Cottam Development Centre
Connah's Quay U1
Connah's Quay U2
Connah's Quay U3
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
442
442 442
435
435 435
345
345 345
345
345 345
345
345 345
Connah's Quay U4 Total
345 4,180
345 345
4,180 4,180
Other
Consolidation
Taylors Lane GT2
Taylors Lane GT3
Grain Aux GT1
Grain Aux GT4
Ratcliffe Aux GT2
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
68
68 68
64
64 64
27
27 27
27
28 28
17
17 17
Ratcliffe Aux GT4 Total
17 220
17 17
221 221
Details on the Swedish power plant portfolio
Hydro1
Hydro Storage Total Hydro Run-of-River Total Total
2,142 203 2,342
1,577 1,386
1,772 1,579
1. Due to Swedish law it is prohibit to disclose details on individual asset-level Note: Plants shown include those plants that were in operation at end of 2020.
Nuclear
Oskarshamn 3
Forsmark 1
Forsmark 2
Forsmark 3
Ringhals 1
Ringhals 2
Ringhals 3
Ringhals 4
Consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated Not consolidated
1,400
763
1,400
988
9.30%
92 0
1,118
9.30%
104 0
1,172
127 0
881
261 0
0
0 0
1,063
315 0
1,103 7,725
334 0
Total
1,996
1,400
Gas
Consolidation
Öresundsverket1
Consolidated
447
447 447
Total
447
447 447
Other
Site
Consolidation
Capacity (technical, MW)
Pro-rata
Stake
Accounting
COD
(MW)
(MW)
Halmstad GT 12
Halmstad GT 11
Öresundsverket GT G24
Öresundsverket GT G25
Barsebäck GT1
Barsebäck GT2
Karlshamn G13
Öresundsverket Diesel G26
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
172
172 172
78
78 78
63
63 63
63
63 63
42
42 42
42
42 42
37
37 37
3
3 3
Karlshamn G2
334
1971
334 334
Note: Plants shown include those plants that were in operation at end of 2020. 1. Öresundsverket facility mothballed in 2018.
Other (cont'd)
Consolidation
Karlshamn G3
Consolidated
328
328
328
Total
1,162
1,162
1,162
Details on the Dutch power plant portfolio
Hard coal
Consolidation
Maasvlakte 3
Consolidated
1,070
1,070 1,070
Total
1,070
1,070 1,070
Gas
Site
Consolidation
Capacity (technical, MW)
Pro-rata
Stake
Accounting
COD
(MW)
(MW)
Rotterdam Capelle GT 3 Galileistraat CHP
Den Haag CHP Leiden CHP UCML
Rotterdam Capelle GT 1
Rotterdam Capelle GT 2 UCML BPT
Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated Consolidated
220
214 214
0
0 0
112
107 107
83
85 85
70
70 70
24
24 24
25
25 25
0 534
0 0
Total
525 525
Details on the Hungarian power plant portfolio
Gas
Consolidation
Gönyü Total
Consolidated
428 428
428 428
428 428
Russian Power
Operating KPIs and Asset List
Operating KPIs on the Russian power plant portfolio
Load Factor | TWh produced2 | |||||
Total | CSA | 12M 2019 | 12M 2020 | 12M 2019 | 12M 2020 | |
Surgutskaya-2 | 5,667 | 807 | 61% | 54% | 30.2 | 27.1 |
Berezovskaya3 | 2,400 | 800 | 31% | 21% | 6.4 | 4.3 |
Shaturskaya | 1,500 | 400 | 32% | 34% | 4.1 | 4.5 |
Smolenskaya | 630 | 0 | 25% | 26% | 1.4 | 1.4 |
Yaivinskaya | 1,048 | 448 | 46% | 47% | 4.2 | 4.4 |
Total | 11,245 | 2,455 | 47% | 42% | 46.4 | 41.7 |
Gross installed capacity1, MW
1. Installed capacity at the end of the period (own consumption is not deductible)
2. Gross production (own consumption is not deducted)
3. Block 3 is under repair
30
Details on the Russian power plant portfolio
Gas
Surgutskaya TG 1
Surgutskaya TG 2
Surgutskaya TG 3
Surgutskaya TG 4
Surgutskaya TG 5
Surgutskaya TG 6
Yaivinskaya TG 5
Surgutskaya TG 8
Surgutskaya TG 7
Shaturskaya TG 7
Shaturskaya TG 4
Shaturskaya TG 5
Smolenskaya TG 1
Consolidated
790
661 790
Consolidated
790
661 790
Consolidated
790
83.73%
1986
661 790
Consolidated
790
83.73%
1987
661 790
Consolidated
790
83.73%
1987
661 790
Consolidated
790
83.73%
1988
661 790
Consolidated
437
83.73%
2011
366 437
Consolidated
400
83.73%
2011
335 400
Consolidated
386
324 386
Consolidated
393
329 393
Consolidated
196
164 196
Consolidated
196
164 196
Consolidated
195
1978
163 195
Gas (cont'd)
Smolenskaya TG 2
Smolenskaya TG 3
Shaturskaya TG 1
Shaturskaya TG 2
Shaturskaya TG 3
Yaivinskaya TG 1
Yaivinskaya TG 2
Yaivinskaya TG 3
Yaivinskaya TG 4
Shaturskaya TG 6
Consolidated
195
163 195
Consolidated
195
163 195
Consolidated
186
83.73%
1971
156 186
Consolidated
186
83.73%
1972
156 186
Consolidated
186
83.73%
1972
156 186
Consolidated
140
83.73%
1963
117 140
Consolidated
140
83.73%
1964
117 140
Consolidated
140
83.73%
1964
117 140
Consolidated
140
117 140
Consolidated
75
62 75
Total
8,527
7,139 8,527
Lignite
Consolidation
Berezovskaya GRES TG 1
Berezovskaya GRES TG 2
Berezovskaya GRES TG 31
Consolidated
754 754 754
83.73% 83.73% 83.73%
1987 1991 2015
632 754
Consolidated
632 754
Consolidated
632 754
Total
2,263
1,895 2,263
Note: Plants shown include those plants that were in operation at end of 2020. 1. Berezovskaya GRES TG 3 facility currently under unscheduled repairs.
Details on assets disposed in 2020
Country
Fuel typeCapacity (technical, MW)
Pro-rata
Stake
COD
(MW)
Teplarna Tabor
Solar Energy Znojmo
Bioplyn Trebon
Czech Republic
Czech Republic
Czech Republic
Gas
20 1 1
51.95% 24.98% 24.67%
1991 2008 1974
11 20
Gas
0 0
Gas
0 0
Total
22
11 20
Global Commodities
Storage and Pipelines
Portfolio of gas storages
Gas storage portfolio at a glance
Key value drivers
Storage
CountryCapacity1
Main applications
Epe L-Gas
Krummhörn
0.4 Peak shaving
Nüttermoor
0.2 Peak shaving
Epe H-Gas
0.1 Peak shaving
Eschenfelden
1.3 Peak shaving and seasonal use
Etzel ESE
<0.1 Peak shaving and seasonal use
Etzel EGL
1.0 Seasonal use and peak shaving
1.0 Seasonal use and peak shaving
Breitbrunn
Bierwang
1.0 Seasonal use
0.8 Mainly seasonal use
7 Fields
Holford
1.6 Mainly seasonal use
0.2 Peak shaving
Total
7.6
Storage can enable time arbitrage value to be captured - gas is injected at times of low prices and withdrawn at times of higher prices
Arbitrage
For seasonal storage this is usually summer and peak winter months, for mid and fast churn storage (peak shaving) arbitrage vale can be captured over shorter time periods
System
Storage close to demand centers can help to lower network investment costs by reducing size of pipelines to meet peak demand
System operators can require location swaps or certain gas qualities to ensure system stability; storage can be used to support this
Storage can provide a safeguard against the high impact of unexpected technical failures, geopolitical risk or severe weather
Insurance
A "security of supply" premium is not currently compensated by the system given well-supplied European gas markets
1. In billion cubic meters (as of 31 December 2020)
36
Pipeline participations
OPAL
Key metrics
Stake
Capacity (100%) Start-up date
20%1,2 36.5 bcm/a 2011
Business description
Connects the Nord Stream landfall point with the exit/entry point at the German-Czech border
Pro-rata transmission capacity long-term marketed
Technical operation provided by majority owner OPAL Gastransport which is indirectly owned by Wintershall and Gazprom
Source: OPAL Gastransport GmbH
1. Stake as of 31 December 2016
BBL
Key metrics
Stake
Capacity (100%) Start-up date
20%1 16 bcm/a 2006
Business description
Connectings the Netherlands and the UK
Capacity marketed via standardised auctions for certain products (forward flow, interruptible forward flow, interruptible reverse flow)
The other partners in BBL are Gasunie (60%) and Fluxys (20%)
Source: OPAL Gastransport GmbH
Stake
2. Stake held by means of Bruchteilsgemeinschaft through 100% subsidiary Lubmin-Brandov Gastransport GmbH
Business description
Crossing Switzerland from North to South, with a connection to the French and the Italian grid Constructed, maintained and operated by Transitgas AG, which is a partnership between Swissgas (51%), FluxSwiss (46%) and Uniper (3%)
Source: Transitgas AG
Capacity (100%) Start-up date
Disclaimer
This document and the presentation to which it relates contains information relating to Uniper SE, ("Uniper" or the "Company") that must not be relied upon for any purpose and may not be redistributed, reproduced, published, or passed on to any other person or used in whole or in part for any other purposes. By accessing this document you agree to abide by the limitations set out in this document.
This document is being presented solely for informational purposes and should not be treated as giving investment advice. It is not, and is not intended to be, a prospectus, is not, and should not be construed as, an offer to sell or the solicitation of an offer to buy any securities, and should not be used as the sole basis of any analysis or other evaluation and investors should not subscribe for or purchase any shares or other securities in the Company on the basis of or in reliance on the information in this document.
Neither Uniper nor any of their respective officers, employees or affiliates nor any other person shall assume or accept any responsibility, obligation or liability whatsoever (in negligence or otherwise) for any loss howsoever arising from any use of this presentation or the statements contained herein as to the fairness, accuracy, completeness or correctness of statements contained herein.
In giving this presentation, neither Uniper nor its respective agents undertake any obligation to provide the recipient with access to any additional information or to update this presentation or any information or to correct any inaccuracies in any such information.
Certain numerical data in this presentation have been rounded according to established commercial standards. As a result, the aggregate amounts (sum totals or interim totals or differences or if numbers are put in relation) in this presentation may not correspond in all cases to the amounts contained in the underlying (unrounded) figures appearing in the consolidated financial statements. Furthermore, in tables and charts, these rounded figures may not add up exactly to the totals contained in the respective tables and charts..
Certain numerical data, financial information and market data (including percentages) in this presentation have been rounded according to established commercial standards. As a result, the aggregate amounts (sum totals or interim totals or differences or if numbers are put in relation) in this presentation may not correspond in all cases to the amounts contained in the underlying (unrounded) figures appearing in the consolidated financial statements. Furthermore, in tables and charts, these rounded figures may not add up exactly to the totals contained in the respective tables and charts.
38