Victoria Gold Corp. provided an update on its exploration drill program. The Eagle exploration drilling program took place from December 2021 through May 2022 and continued on the success of the 2021 Eagle Deep drilling program.

The 2022 program focused on key areas for the potential expansion of the Eagle Gold deposit to the west of the existing Eagle Gold pit. In total, 10,342 meters (“m”) of diamond drilling in 23 drill holes (average depth of 450m) have added approximately 500m of mineralized strike length from the current Eagle pit boundary. Highlights of the Eagle exploration program include: DG22-1006C: 301.0m at 0.52 g/t Au from 102.0m including: 69.5m at 0.72 g/t Au from 244.0m; DG22-1013C: 215.0m at 0.60 g/t Au from 206.5m including 51.0m at 0.88 g/t Au from 355.5m; DG22-1017C: 72.3m at 1.14 g/t Au from Surface including: 32.7m at 2.24 g/t Au from 50.3m; DG22-1023C: 240.3m at 0.63 g/t Au from 254.0m including: 78.0m at 1.29 g/t Au from 284.0m.