Walker River Resources Corp. announce initial drill results from its 2020-2021 reverse circulation (“RC”) drill programs. These results are from the Lapon Canyon portion of the wholly owned Lapon Gold Project, located within the Walker Lane shear zone in northern Nevada. RC drill hole LC21-58 returned 9.45 g/t Au over 16.8 meters, including 39.2 g/t Au over 3 meters, at a depth of approximately 15 meters. From surface to 29 meters the hole returned 5.3 g/t over 29 meters. RC drill hole LC21-57 returned 1.02 g/t Au over 24.4 meters, and 2.12 g/t Au over 9.2 meters, at depths starting at approximately 9 meters. The second assay is significant as it was from unaltered granite, which to date has been essentially barren. RC drill hole LC20-53 returned 1.04 g/t Au over 59.5 meters, at a depth starting at 7.6 meters. RC drill hole LC20-50 returned 1.42 g/t Au over 13.7, at a depth of starting at 12 meters. The above drill assays are not necessarily in chronological drilling order, results are reported as received. Further results are pending and will be released as they become available. The gold mineralization at Lapon Canyon is contained in a wide (300 meters), long (over 4km strike length), intensely altered (sericite, iron oxides) sheared and faulted NE trending zone. Gold mineralization is present pervasively throughout as an envelope of lower grade mineralization (0.5 to 2.0 g/t Au) enveloping distinct high-grade structures, that have been drilled over a strike length of 800 meters and a vertical extent of 400 meters. The high-grade gold mineralization was encountered in discrete, traceable zones located at the intersection of flat lying porphyry dikes and vertical stockwork fracture chimneys. Examples of high-grade drill hole intercepts include: 48 g/t over 13.7 meters in hole LC 16-10; 39 g/t over 12.0 meters in hole LC 16-12; 31 g/t over 13.7 meters in hole LC 18-29; 96 g/t over 13.7 meters in hole LC 19- 42; and 94 g/t over 6.1 meters in hole LC 19- 43. Gold mineralization is open. The present drill program at the Lapon Canyon portion of the Project, consists of systematic drilling on section for geological modelling purposes. Exploration drilling to discover new gold mineralization and extend known gold mineralization. At least 60 – 65 drillholes are planned in the present program. At the Pikes Peak portion of the Project, the Company has completed access for future exploration. An additional mapping and sampling program is currently underway, initial results returned values of 9 g/t Au and 2.22% Cu from outcrop. Significant historical milling and mining workings are present. At least 10 holes are planned here and drill program permitting is currently underway. The Rattlesnake portion contains historical adits and extensive gold placer mining activities, all within the altered sheared zone encountered at Lapon Canyon, some 600 meters higher and 3 km on strike from Rattlesnake. At least 10 holes are planned here.