17th October 2016 West African hits 16m at 69.1g/t Au including 2m at 315.3g/t Au from 209m at M1 South

Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to report further high-grade RC results from the M1 prospect, at its 100%-owned Tanlouka Gold Project, Burkina Faso.

Highlights
  • More high grade results from M1 South with 16m at 69.1g/t Au including 2m at 315.3g/t Au from 209m
  • Deepest results to date, outside current resource area, down dip of previous drilling
  • New results to be included in resource update in Q4 2016
  • Feasibility study in progress on track for completion in Q4 2016
  • $19.5m cash at bank and no debt

    Managing Director Richard Hyde commented:

    "Extensional drilling at M1 South has intercepted mineralisation beneath of the current resource area, returning 16m at 69.1g/t Au including 2m at 315.3g/t Au from 209m.

    A further gold zone up hole returned 9m at 11.17 g/t Au including 2m 32.8g/t Au from 197m.

    "These are the deepest results to date and will extend the resource beyond 200m vertical metres. Drilling is currently focussed on extending mineralisation to 300m below surface beneath the current M1 South resource. A further resource updated is expected in Q4, in parallel with completion of feasibility studies for the project."

    M1 South Drilling at Depth

    Diamond drilling is in progress at M1 South with the aim of extending mineralisation beneath the current resource. Drilling is being completed using two multipurpose contract rigs operating double shift, in parallel with WAF's two diamond rigs operating on a single shift basis. Drilling is being completed on 25m by 50m grid along 350m strike. Significant results from the on-going drilling program include:

  • TAN16-DD053: 4m at 1.74 g/t Au from 126m

  • TAN16-DD054: 6m at 1.3 g/t Au from 174m, and

    • 7m at 1.95 g/t Au from 183m, and

    • 3m at 8.91 g/t Au from 218m including 1m at 23.8g/t Au

      TAN16-DD055: 9m at 11.17 g/t Au, from 197m including 2m 32.8g/t Au, and

      ­ 16m at 69.11 g/t Au from 209m, including 2m at 315.3g/t Au

  • TAN16-DD056 2m at 4.06 g/t Au from 221m

Principal Office: 14 Southbourne Street, Scarborough WA 6019, Western Australia

T: + 61 8 9481 7344 F: + 61 8 9481 7355 E: info@westafricanresources.com www.westafricanresources.com ACN: 121 539 375

Tanlouka Gold Project

M1 South Diamond Drilling - Visible gold in TAN16-DD055 211 - 214m down hole

Table 1: Tanlouka Gold Project M1 South Diamond Drilling TAN16-DD055 One Metre Results

Hole ID

From (m)

To (m)

Sample Id

Au g/t

Hole ID

From (m)

To (m)

Sample Id

Au g/t

TAN16-DD055

190

191

217119

0.03

TAN16-DD055

210

211

217144

2.84

TAN16-DD055

191

192

217122

0.04

TAN16-DD055

211

212

217145

39.38

TAN16-DD055

192

193

217123

0.01

TAN16-DD055

212

213

217146

68.04

TAN16-DD055

193

194

217124

0.03

TAN16-DD055

213

214

217147

332.10

TAN16-DD055

194

195

217125

0.03

TAN16-DD055

214

215

217148

298.57

TAN16-DD055

195

196

217126

0.04

TAN16-DD055

215

216

217149

83.10

TAN16-DD055

196

197

217127

0.03

TAN16-DD055

216

217

217150

70.19

TAN16-DD055

197

198

217128

7.46

TAN16-DD055

217

218

217151

18.48

TAN16-DD055

198

199

217129

0.10

TAN16-DD055

218

219

217153

10.24

TAN16-DD055

199

200

217131

38.87

TAN16-DD055

219

220

217154

137.50

TAN16-DD055

200

201

217132

26.78

TAN16-DD055

220

221

217155

11.14

TAN16-DD055

201

202

217133

20.63

TAN16-DD055

221

222

217156

3.98

TAN16-DD055

202

203

217134

1.20

TAN16-DD055

222

223

217157

0.91

TAN16-DD055

203

204

217135

4.52

TAN16-DD055

223

224

217158

13.63

TAN16-DD055

204

205

217136

0.26

TAN16-DD055

224

225

217159

0.85

TAN16-DD055

205

206

217137

0.70

TAN16-DD055

225

226

217162

0.05

TAN16-DD055

206

207

217138

0.07

TAN16-DD055

226

227

217163

0.03

TAN16-DD055

207

208

217139

0.15

TAN16-DD055

227

228

217164

0.01

TAN16-DD055

208

209

217142

0.13

TAN16-DD055

228

229

217165

0.04

TAN16-DD055

209

210

217143

14.80

TAN16-DD055

229

230

217166

0.04

Step-out drilling to the northwest and closing the gap between M1 and M5, is expected to start in late October or early November when the wet season has abated and ground conditions and access have improved. Resource definition RC drilling at M5 has been paused to allow focus to be directed to M1 South, and to reduce rig movement during the current wet season.

Figure 1: Tanlouka Gold Project - Mineralised Trends and Prospect Locations

A summary plan and sections for M1 South are presented below. Full results are presented in Table 1.

Figure 2: M1 South Summary Plan

West African Resources Limited published this content on 17 October 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 17 October 2016 03:58:04 UTC.

Original documenthttp://www.westafricanresources.com/wp-content/uploads/2016/10/01789964.pdf

Public permalinkhttp://www.publicnow.com/view/67FFDD4BDDCC434CCC1D0577CAE15F8FEFAD90C2