M/s. CFF Fluid Control Limited has received the Biennial Rate Contract for Engineering Work for Project-MRLC-2 INS SHANKUSH from M/s. Mazagon Dock Shipbuilders Limited totaling to approx. INR 464.6 million (Including Tax). Whether Domestic or International: Domestic.

Time Period by which the order(s)/contract(s) is to be executed is Delivery by August 2026.