Estrella Resources Limited announced further assays have been received for the Company's Spargoville Nickel Project, located approximately 20km South West of Kambalda, Western Australia. 75% of the assays are back from the laboratory, with results confirming the 5A Deposit contains significant grades below the open pit. The drilling confirmed significant widths in line with previous drilling.

Estrella's confirmation holes also identified the sheared closure of the deposit 90m below surface, once again in line with previous modelling. The current work on the mineralogy will inform the creation of metallurgical samples for flotation testing, and to understand the nature of the bulk sample due to be removed in September, which will be used to test the viability of an alternate revenue stream. Geological modelling work has begun so an updated resource estimate can be calculated prior to the bulk sample being extracted.

Additionally, a pump has been installed in the 5A Pit to remove the drill water that has accumulated in the pit base due to the diamond drilling.