Valuation : Magnetite Mines Limited

Market Cap 3.65M 2.62M 2.25M 2.11M 1.93M 3.64M 251M 24.96M 9.76M 126M 9.85M 9.64M 418M P/E 2024
-4.91x
P/E 2025 -2.24x
Enterprise Value 5.36M 3.85M 3.31M 3.1M 2.84M 5.34M 368M 36.67M 14.33M 185M 14.47M 14.15M 614M EV / Sales 2024
116,504,294x
EV / Sales 2025 9,610,419,460x
Free-Float
64.34%
Yield 2024 *
-
Yield 2025 -
Manager TitleAgeSince
Comptroller/Controller/Auditor - 2009-12-31
Corporate Officer/Principal - -
Director TitleAgeSince
Chairman - 2024-09-22
Director/Board Member 66 2022-06-01
Chairman - 2026-05-25
Change 5-day change 1-year change 3-year change Capi.($)
-.--%-.--% - - 2.97M
+1.36%+5.63%+57.80%+54.54% 243B
-0.34%+3.22%+66.62%+58.08% 179B
+0.41%+9.85%+90.85%+191.72% 107B
-0.21%+2.15%+102.15%+35.20% 94.94B
-0.99%+6.41%+33.40%+72.52% 72.06B
+0.51%+5.48%+91.63%+78.21% 61.78B
-0.65%+1.96%+109.15%+77.77% 34.59B
-0.43%+1.88%+80.53%+450.82% 31.74B
+1.92%+12.22%+44.55%+96.65% 26.99B
Average +0.12%+4.38%+75.19%+123.95% 94.47B
Weighted average by Cap. +0.29%+3.44%+71.65%+90.63%

Financials

2024 2025
Net sales 0.21 0.15 0.13 0.12 0.11 0.21 14.74 1.47 0.57 7.43 0.58 0.57 24.58 0 0 0 0 0 0 0.08 0.01 0 0.04 0 0 0.14
Net income -4.85M -3.49M -2.99M -2.8M -2.57M -4.83M -333M -33.19M -12.97M -168M -13.09M -12.81M -556M -4.19M -3.01M -2.59M -2.42M -2.22M -4.18M -288M -28.67M -11.21M -145M -11.31M -11.07M -480M
Net Debt -1.1M -788K -677K -633K -580K -1.09M -75.27M -7.5M -2.93M -37.94M -2.96M -2.9M -126M 1.71M 1.23M 1.06M 988K 905K 1.7M 117M 11.7M 4.57M 59.19M 4.62M 4.52M 196M
Logo Magnetite Mines Limited
Magnetite Mines Limited is an Australia-based iron ore company. The Company is focused on the development of magnetite iron ore resources in the highly prospective Braemar iron region of South Australia. Its projects include the Razorback Iron Ore Project and Muster Dam Iron Ore Project. The Razorback Iron Ore Project is a pre-development magnetite iron ore project capable of producing high-grade and Direct-Reduction grade (DR-grade) iron ore products required in low-carbon and zero-carbon steel production. It consists of the Razorback and Iron Peak deposits. It is located just 240 kilometers (kms) northeast of Adelaide in arid, low-intensity pastoral country. The Muster Dam Iron Ore Project is hosted by the same Braemar Iron Formation as the Razorback Iron Ore Project. The Project is located approximately 110 km to the northeast of Razorback Iron Ore Project. The Project produces the required specification of DR-grade, very low impurity products necessary for green iron production.
Employees
-