Supporting Drilling Information to Alacer Gold Announcement

This document provides supporting drill collar locations for the Copper Hill drilling program referenced in the announcement "Alacer Gold Reports Initial Drill Results from the Copper Hill Copper Exploration Prospect", dated April 22, 2020.

Drill collar locations are surveyed in UTM Zone 37N, ED50 grid using hand-held GPS in units of meters. All drilling was diamond core drilling with HQ and PQ core sizes. HQ is 63.5mm and PQ is 85 mm in diameter.

Drill Collar Coordinates

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

End of

Hole (m)

EKD-01

483368

4491473

2200

120

-60

474.2

EKD-02

483198

4491520

2233

120

-60

373

EKD-03

483196.5

4491521

2233

0

-90

301.3

EKD-04

483186.4

4491469

2247

120

-60

425

EKD-05

483225

4491563

2216

120

-60

393.5

EKD-06

483195

4491518

2229

300

-65

302

EKD-07

483191

4491407

2263

120

-60

408.2

EKD-08

483186.4

4491469

2247

0

-90

503.6

Drill Intercepts

Significant intervals reported at a nominal 0.2% copper cut-off and with a maximum 5m contiguous dilution are given in the table below. All thicknesses are down hole length and true widths are not known at this stage.

Hole ID

From

To (m)

Interval

Cu

Depth

Comments

(m)

(m)

%

(m)

EKD-01

168.8

177.8

9

0.37

474.2

Including

168.8

169.8

1

2.12

EKD-02

77.70

118.50

40.80

0.87

144.70

185.50

40.80

2.66

Including

152.90

169.60

16.70

4.70

373

174.00

182.20

8.20

2.95

EKD-02

202.00

218.60

16.60

0.44

290.40

301.30

10.90

0.50

33.00

39.00

6.00

0.39

EKD-03

45.00

55.50

10.50

0.20

301.3

83.70

154.00

70.30

1.66

Including

115.30

119.70

4.40

8.25

13.00

64.00

51.00

0.98

EKD-04

120.40

127.10

6.70

0.60

133.40

143.70

10.30

0.77

425

158.70

204.40

45.70

2.03

Including

162.80

180.50

17.70

3.99

EKD-04

255.00

262.80

7.80

0.85

Hole ID

From

To (m)

Interval

Cu

Depth

Comments

(m)

(m)

%

(m)

327.10

341.70

14.60

0.47

351.50

372.80

21.30

1.98

Including

362.80

368.60

5.80

6.17

11.30

41.10

29.80

0.49

EKD-05

109.50

115.00

5.50

0.99

393.5

189.50

210.20

20.70

1.33

Including

191.30

194.00

2.70

5.55

25.00

35.00

10.00

0.34

42.00

43.50

1.50

3.30

EKD-06

88.50

102.50

14.00

0.37

302

133.50

150.30

16.80

0.90

157.60

176.60

19.00

1.43

Including

173.00

175.80

2.80

5.47

EKD-07

408.2

No Significant

Interval

EKD-08

108.00

116.80

8.80

0.38

170.10

191.00

20.90

1.63

503.6

Including

181.00

183.00

2.00

7.15

Including

188.10

189.80

1.70

3.52

Attachments

  • Original document
  • Permalink

Disclaimer

Alacer Gold Corp. published this content on 22 April 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 22 April 2020 11:12:03 UTC