A N N UA L F I N A N C I A L R E P O RT 2 0 2 2

2030 Action Plan

ENVIRONMENTAL TARGETS

SDGs

Ambition

Action

Result 2022

Target

Timeframe

13

Contribute to climate

Reduce the absolute scope 1 & 2

38%

50%

2030

change mitigation

GHG emissions (vs 2018)

13

Contribute to climate

Reduce the specific scope 1 & 2

12%

50%

2030

change mitigation

GHG emissions (vs 2018)

Contribute to climate

Reduce the absolute scope 3 GHG

13

emissions (except emissions related

6%

30% by 2030

2030

change mitigation

to acquisitions) (vs 2018)

13

Contribute to climate

Increase the part of green electricity

100%

100%

2023

change mitigation

of landlord-controlled buildings

7, 13

Contribute to climate

Increase renewable installed capacity

1 194 kWp

2 200 kWp

2025

change mitigation

13

Contribute to climate

Reduce energy intensity of landlord-

152 kWh/m²

116 kWh/m²

2030

change mitigation

controlled buildings

Contribute to climate

Align with the recommendations of

13

the Task Force on Climate-Related

Ongoing

Fully aligned

2026

change adaptation

Financial Disclosures (TCFD)

Contribute to the

6

sustainable use and

Reduce water consumption

231.1 l/m²

226.5 l/m²

2030

protection of water

Contribute to the

Maintain existing elements and reuse

Permanent

12

transition to a circular

materials by submitting projects1 to

100%

100%

economy

an inventory of materials

target

Contribute to the

12

transition to a circular

Build flexible and adaptable projects1

100%

100%

2030

economy

13, 15

Contribute to pollution

Strengthen and improve selection

Ongoing

Qualitative

Permanent

prevention and control

criteria for building materials

target

target

Contribute to the

Study biodiversity management on

15

protection and

Ongoing

100%

2025

portfolio

restoration of biodiversity

Use certification systems

Permanent

9

to deliver sustainable

Obtain certifications for projects1

100%

100%

target

assets

Use certification systems

Obtain "In-Use" certifications for

9

to deliver sustainable

44%

35%

2022

buildings

assets

Use certification systems

Cover the eligible portfolio2 with an

9

to deliver sustainable

100%

100%

2022

energy performance certificate

assets

9

Create innovative and

Create innovative projects1: promote

100%

100%

2025

sustainability, technical, and

sustainable buildings

technological improvements

Provide buildings

Invest near public transport hubs,

accessible through

11

Invest in mobility hubs if no public

68%

100%

2030

sustainable transport

transport system is available

systems

Provide buildings

11

accessible through

Equip the parking spaces with

12%

100%

2030

sustainable transport

charging points

systems

Reduce the

Reduce paper use by asking for

12

environmental impact

92%

100%

2022

electronic incoming invoices

of the team

Reduce the

Reduce paper use by sending

12

environmental impact

100%

100%

2022

electronic outgoing invoices

of the team

Reduce the

Promote a flexible and sustainable

11

environmental impact

36%

40%

2025

mobility

of the team

Reduce the

Reduce waste by composting organic

43 kg/FTE

0 kg/FTE

12

environmental impact

2030

waste and sorting of waste

of the team

1 Projects: committed ongoing (re)development projects (ZIN, Pacheco).

  • Excluding a building under redevelopment, for which the certificate has expired and will be renewed after renovation.

NON-FINANCIAL STATEMENTS

04

241

A N N UA L F I N A N C I A L R E P O RT 2 0 2 2

SOCIAL TARGETS

SDGs

Ambition

Action

Result 2022

Target

Timeframe

3, 4, 5, 8, 10

Take care of the team

Increase the overall team

Not calculated1

95%

Permanent

and the community

satisfaction

target

3, 4, 5, 8, 10

Take care of the team

Increase workload satisfaction

Not calculated1

8/10

Permanent

and the community

target

3, 4, 5, 8, 10

Take care of the team

Improve work-life balance

Not calculated1

8/10

Permanent

and the community

target

3, 8

Build and animate

Extend the coworking network

46 050 m²

51 800 m²

2023

communities

and meeting opportunities

85 000 m²

2025

Build and animate

Decide on a method to rate

NPS score of

NPS score of at

Permanent

3

the overall satisfaction of

communities

22 (GOOD)

least 30 (GREAT)

target

tenants

3, 9

Improve comfort,

Reduce the number of

9

0

Permanent

security and safety

incidents involving people

target

Improve comfort,

Improve safety through

Permanent

3, 9

inspections on fire prevention,

96%

100%

security and safety

target

lifts, electricity and heating

11

Integrate buildings into

Open up projects2 to the city

100%

100%

Permanent

cities

and its community

target

4, 10

Integrate buildings into

Carrying out projects2 in

100%

100%

Permanent

cities

dialogue with stakeholders

target

GOVERNANCE TARGETS

SDGs

Ambition

Action

Result 2022

Target

Timeframe

5, 10, 16

Behave ethically

Create new Human Rights policy

Ongoing

Published

2023

16

Behave ethically

Control all digitalisation projects

100%

100%

Permanent

within the framework of GDPR

target

Use ESG regulation to

16

accelerate the

Align with future ESG regulations

Ongoing

Fully aligned

2026

sustainability transition

12

Adopt a due diligence

Receive the new code of

36%

100%

2023

strategy

conduct signed by the suppliers

12

Adopt a due diligence

Assess significant3 suppliers on

To be initiated in

100%

2024

strategy

ESG aspects

2023

4, 12

Adopt a due diligence

Engage significant3 suppliers on

To be initiated in

100%

2030

strategy

ESG aspects

2023

17

17

Promote green

Analyse the opportunity to

investment

implement a Sustainability Linked

Ongoing

Implemented

2023

opportunities

Loan framework

Maintain a transparent

Participate in voluntary investor

3

Min. 2

Permanent

communication

assessments on an annual base

target

  • Due to the organisational changes related to the takeover bid, Befimmo has exceptionally postponed its employee satisfaction survey to H1 2023. The indicators related to this survey where therefore not calculated in 2022.
  • Projects: committed ongoing (re)development projects (ZIN, Pacheco).
    3 Significant suppliers are suppliers having a potential risk on ESG aspects.

NON-FINANCIAL STATEMENTS

04

242

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Befimmo SA published this content on 28 April 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 28 April 2023 06:46:08 UTC.