Clarity Gold Corp. announced the third tranche of analytical results from the approximately 10,800 meter diamond drill program at the Destiny Project in the Abitibi Greenstone Belt. Selected Intercepts DAC Zone: DES21-164: 0.76 g/t Au over 36.65 m and 0.44 g/t Au over 55.9 m; DES21-169: 0.42 g/t Au over 43 m and 1.04 g/t Au over 14.45 m; DES21-170: 1.22 g/t Au over 30 m including 8.85 g/t Au over 2.55 m and 39.29 g/t Au over 0.5 m; and DES21-171: 1.34 g/t Au over 14.25 m and 0.78 g/t Au over 37.25 m. Selected Intercepts Gap Zone: DES21-165: 0.32 g/t Au over 25.5 m and 0.34 g/t Au over 24 m; and DES21-167: 1.32 g/t Au over 9.6 m including 5.05 g/t Au over 1.6 m. The results in this press release are from holes completed on the central portion of the DAC Zone and Gap Zone that were designed to infill and confirm the mineralized structure and anticipated mineralization identified in historic drilling. The results of this drilling will play an important role in understanding the distribution of mineralization. Drill core is transported to a facility in Val d?Or where it is logged, photographed, and sampled. Once logging is complete, samples of half core are sawed, prepared and securely shipped to Bureau Veritas Laboratories in Timmins for processing and analysis, an independent, ISO 17025 certified facility. Samples were crushed to 70% passing 2mm and a 250g subsample was pulverized to 85% passing 75?m. The subsample was analyzed by a combination of fire assay with atomic absorption finish for gold and aqua regia digestion with an ICP-ES finish for a suite of 33 elements. Samples containing visible gold or which returned over 2.0 g/t Au were analyzed by metallic screen fire assay. The Company has established a QA/QC program consisting of inserting quality control (QC) samples at regular intervals in the sample stream, including blanks, duplicates, and reference materials.