Clarity Gold Corp. provided an update of the ongoing 10,000 m planned diamond drilling program at the Company’s gold project, Destiny, located in the prolific Abitibi Region in Quebec. To date, the Company’s technical team has processed and dispatched samples from approximately 2,300 m of drill core. Drilling so far has concentrated on infill of the western portions of the DAC Zone and confirmation of historic drilling which identified mineralization here. The recently added second drill rig is focusing on drilling infill, and extension to depth in the GAP Zone. Drill core is transported to a facility in Val d’Or where it is logged, photographed, and sampled. Once logging is complete, samples of half core are prepared and will be securely shipped to Bureau Veritas Laboratories in Timmins for processing and analysis, an ISO 17025 certified facility. The Company has established a QA/QC program consisting of inserting quality control (QC) samples at regular intervals in the sample stream, including blanks, duplicates, and reference materials. Samples are anywhere from 0.30 m to 2 m long and commonly ~1 m long. Specific Gravity (SG) measurements are taken every 10 m outside of the shear zone and 5 m within the zone. The Destiny Project is located in the prolific Abitibi Greenstone Belt where more than 190 million ounces of gold have been produced historically along major structural breaks within the assemblage of Archean-age volcanic, sedimentary and intrusive rocks. The Destiny Project lies along the approximately 400 km long Chicobi Deformation Zone, a major structural break which is largely underexplored in the Abitibi Greenstone Belt. The 5,013 ha project includes the DAC Zone, one of several gold zones along an approximately 6 km long segment of the Despinassy Shear Zone within the Chicobi Deformation Zone. Approximately 2.5 km east along strike of the DAC Zone is the Darla Zone. In between the Darla and DAC is the coarsely drilled GAP zone where 2012 drilling intercepted anomalous gold in all 12 holes which were spaced 100 m apart. The current exploration potential is based on decades of past work on the Destiny Project. Exploration of the Destiny Project dates back to the 1930s. The first concerted diamond drilling campaign commenced in 1998.