REVIVING A HIGH GRADE ZINC MINE

Expanding a rich resource in Mexico

ZINC IS IN DEMAND

BEST PERFORMER LONDON

METALS EXCHANGE (LME) 2016

Goldman Sachs predicting worldwide shortage of zinc to increase to 360,000t in 2017 Chinese infrastructure projects driving demand LME warehouse stocks are down 2

THE PLOMOSAS PROJECT

  • Multiple, very high grade Zn-Pb-Ag deposits grading 18-25% Zn+Pb with 60g/t Ag

  • Granted Mining Leases (to 2042)

  • Significant exploration upside, immediate drill targets, 7km strike

  • Near-term production asset

  • Established underground access to mineralization

  • Excellent infrastructure

  • Historically clean mineralogy and high metallurgical recoveries

  • Low cost and low capex mining and processing options

  • CZL 80% ownership, rights to acquire 100%

3

GRADE IS KING

  • Widespread in-mine sampling confirm high grade resource

  • Historic mine grade averaged 24% Zn+Pb plus Ag credits

  • Produced clean concentrate - no deleterious elements

  • Drilling to establish resource tonnes - maiden JORC end 2016

4

Consolidated Zinc Limited published this content on 27 September 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 28 September 2016 04:50:02 UTC.

Original documenthttps://www.consolidatedzinc.com.au/wp-content/uploads/2016/09/Mines-Money-September_2016-FINAL.pdf

Public permalinkhttp://www.publicnow.com/view/376E8C765C61F3E0DDF2B0F864794D92E2B07F24