As part of this order, GTT will design the tanks of the vessel which will offer a capacity of 174,000 m3. The LNGC tanks will be fitted with the GTTMark III Flexmembrane containment system.
Delivery of the vessel is scheduled for the last quarter of 2024.
Media contact:
press@gtt.fr/ mlbouchon@three-sixty-advisory.com / +33 (0)6 31 62 23 48
Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87
>Download in .pdf
[1]Liquefied Natural Gas Carrier
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 04 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 January 2022 17:08:11 UTC.