To restore coastal fortifications on the Zhaiyk River in Atyrau and on the Zhem River in Kulsary, Atyrau region, 34 units of special equipment of KazTransOil JSC were involved: 13 dump trucks, 7 front loaders, 1 mobile fuel tanker, 3 pickups, 1 trawl, 1 bulldozer, 4 excavators, 1 KAMAZ (MPRU), 1 loader, 1 UAZ, 1 backhoe loader.

From April 5 to April 8, as part of the restoration of the bank fortifications of the Zhaiyk River, 535 trips to deliver soil were carried out, 2070 meters of bank fortification were restored. The work is currently ongoing.

44 employees of KazTransOil JSC are participating in flood control work in the Atyrau region.»

To provide assistance to flood victims, employees of the KazTransOil JSC group of companies sent about 80 million tenge to the Kazakhstan Khalkyna public fund.

Attachments

  • Original Link
  • Permalink

Disclaimer

KazTransOil JSC published this content on 08 April 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 April 2024 11:59:09 UTC.