Gold Lion Resources Inc. announced that it has finalized arrangements to commence its 2023 exploration program (Phase 1) at the Mia-3 Lithium Project located in Eeyou Istchee, James Bay, Quebec. The Phase 1 program is planned to commence June 20 and will include surface mapping, prospecting, and rock sampling to test for lithium mineralization and lithium-cesium-tantalum (LCT) characteristics in pegmatites that may be located across the property. Geologica Groupe-Conseil Inc. ("Geologica") have been engaged to perform the Phase 1 field examination work following on from the compelling targets identified by the Company's compilation of the Quebec Government and mineral sector historic exploration work.

The field examination is planned for 10 days of helicopter supported exploration, designed to cover the complete 57 claim Mia-3 project. The Mia-3 project is located 14 km to the northwest of the Miakadow Lake lithium pegmatite occurrence (now named Mia-1). Both are within the within the La Grande geological sub-province.

These pegmatites were documented in 1991 by Noranda Exploration while exploring for gold and base metals. Later exploration in the Miakadow Lake area by Ressources Dianor Inc. (1999) describes a felsic pluton and a series of coarsely pegmatitic dykes related to the Vieux-Comptoir granites which intrude the La Grande and are seen along the south and south-west shores of Miakadow Lake. The Vieux Comptoir granitic rocks intrude multiple lithologies in the La Grande sub province and are a key exploration vector which Gold Lion will investigate during this initial field program.

Geologica recently completed a property Technical Report dated May 5, 2023, "NI 43-101 Technical Evaluation Report of the Mia Li-3 Lithium Project". Geologica will be updating this report with results from their site visit as well as providing the first full coverage map for the property from new information.