01 April 2022

ASX RELEASE

Widest Zone of Copper Intersected To Date at Lone Star

  • o Significant zones of mineralisation intersected include:

  • o 149.4m @ 0.7 % Cu, 0.2 g/t Au & 1.3 g/t Ag from 12.8m (LS21-016) including:

    • 4.6m @ 3.1 % Cu, 1.4 g/t Au & 11.7 g/t Ag from 108.8m

    • 4.3m @ 1.1 % Cu, 0.2 g/t Au & 7.4 g/t Ag from 45.1m

    • 9.2m @ 1.0% Cu, 0.2 g/t Au & 4.7 g/t Ag from 127.1m

  • o 33.2m @ 0.9 % Cu, 0.5 g/t Au & 4.5 g/t Ag from 16.5m (LS21-015)

  • o 54.9m @ 0.7 % Cu, 0.2 g/t Au & 3.4 g/t Ag from 6.1m (LS21-021) (note: only 50% of assays received thus far) including:

    • 7.3m @ 2.1 % Cu, 0.7 g/t Au & 19.1 g/t Ag from 6.1m

  • o 25.3m @ 0.7 % Cu, 0.2 g/t Au & 1.4 g/t Ag from 50.3m (LS21-024)

  • o 3.1m @ 2.6% Cu, 0.9 g/t Au & 8.6 g/t Ag from 108.8m and 8.2m @ 1.3 % Cu, 1.0 g/t Au & 4.8 g/t Ag from 119.5m (LS21-011)

  • o Results from a further 6 completed drill holes still outstanding with drilling continuing 24/7.

Marquee Resources Limited ("Marquee" or "the Company") (ASX:MQR) is pleased to announce results from the latest batch of assays at the Lone Star Copper-Gold Project, Washington State, USA ("Lone Star" or "The Project").

Results from this batch of assays have intersected wides zones (up to 150m) of significant copper mineralisation that extends well beyond the extents of historical drill hole results. The wides zones of mineralisation are interpreted to be related to sub-vertical feeder dyke that has been the conduit for upwelling magmas during rhyolite dome emplacement and mineralisation (Figure 1).

Executive Chairman Comment

Marquee Executive Chairman, Mr. Charles Thomas, commented: "It's great to see the drilling further unlock our knowledge of the Lone Star deposit and extend the envelope of mineralisation well beyond the previously defined limits. These results validate the geological model developed by the Project Geologist on-site and opens up the potential to identify further sub-vertical, mineralised dykes."

"Drilling continues 24/7 and we have a further 6-holes at the lab awaiting assays, so it's going to be an exciting few months as we work towards completing our maiden drill campaign at the Project. We know the mineralisation at Lone Star plunges to the south-east, so we expect to see the excellent results continue as we systematically work through the drilling program from north to south. Resource modelling studies continue in the background and we are highly encouraged by what the drilling has produced thus far."

Figure 1: Cross-section 5428236N highlighting the mineralised feeder dyke intersected in drill holes LS21-015 & LS21-016.

Significant results from the latest batch of assays include:

  • o 149.4m @ 0.7 % Cu, 0.2 g/t Au & 1.3 g/t Ag from 12.8m (LS21-016) including:

    • 4.6m @ 3.1 % Cu, 1.4 g/t Au & 11.7 g/t Ag from 108.8m

    • 4.3m @ 1.1 % Cu, 0.2 g/t Au & 7.4 g/t Ag from 45.1m

    • 9.2m @ 1.0% Cu, 0.2 g/t Au & 4.7 g/t Ag from 127.1m

  • o 33.2m @ 0.9 % Cu, 0.5 g/t Au & 4.5 g/t Ag from 16.5m (LS21-015)

  • o 54.9m @ 0.7 % Cu, 0.2 g/t Au & 3.4 g/t Ag from 6.1m (LS21-021) (note: only 50% of assays received thus far) including:

    • 7.3m @ 2.1 % Cu, 0.7 g/t Au & 19.1 g/t Ag from 6.1m

  • o 25.3m @ 0.7 % Cu, 0.2 g/t Au & 1.4 g/t Ag from 50.3m (LS21-024)

  • o 3.1m @ 2.6% Cu, 0.9 g/t Au & 8.6 g/t Ag from 108.8m and 8.2m @ 1.3 % Cu, 1.0 g/t Au & 4.8 g/t Ag from 119.5m (LS21-011)

The geological model that has been developed for the Lone Star deposit is that at least three separate rhyolite sills, with associated volcanogenic massive sulphide (VMS) copper-silver mineralisation, are fed by sub-vertical feeder dykes. The mineralised sub-vertical dykes are estimated to be approx. 20-40m wide, extend laterally for tens to hundreds of metres, and are vertically extensive. Identification of the mineralised dykes opens up the possibility ofdefining significant additional mineralisation outside the flat-lying, VMS mineralisation that has been historically identified.

High-grade gold mineralisation is discordant with high-grade copper-silver mineralisation and it is interpreted that early volcanogenic massive sulphide (VMS) style copper-silver mineralisation has been overprinted by later shearing, brecciation and hydrothermal gold deposition. As such, the results indicate the potential to define further high-grade, structurally controlled gold mineralisation that was not a focus of historical exploration programs.

Table 1: Lone Star planned drilling program. BLUE shading = assays received. EOH = end of hole. Only 50% of results received for LS21-021

Hole Depth

Plan ID

EastingNorthingELEVAziDip

Plan IDEastingNorthingELEVAziDipHole Depth (m)

(m)

LS21-001382789

230.1 (EOH)LS21-022382865

5428217

1114.8

0

-90 209.1 (EOH)

LS21-002382802

LS21-003382799

224.3 (EOH)LS21-023382913

282.5 (EOH)LS21-024382821

-90 212.4 (EOH)

-90 197.3 (EOH)

LS21-004382777

LS21-005382855

191.1 (EOH)LS21-025382856

-90 215.5 (EOH)

5428302

1103.4

270

-70

110

LS21-026382890

5428187

1129.6

0

-90 236.8 (EOH)

LS21-006382857

139.3 (EOH)LS21-027382930

5428187

1136.4

0

-90 260

LS21-007382906

212.4 (EOH)LS21-028382689

5428149

1078.5

0

-90 50

LS21-008328781

LS21-009382818

133.2 (EOH)LS21-029382742

-90 80

90.5 (EOH)

LS21-030382783

5428149

1113.9

0

-90 120

LS21-010382819

197.2 (EOH)LS21-031382808

5428149

1119.8

0

-90 140

LS21-011382906

139.3 (EOH)LS21-032382839

5428149

1124

0

-90 210

LS21-012382710

5428248

1075.7

0

-90

95.7 (EOH)

LS21-033382926

5428149

1139.1

0

-90 260

LS21-013382754

5428250

1073.1

0

-90

252 (EOH)

LS21-034382703

5428095

1102.3

0

-90 70

LS21-014382782

130.2 (EOH)LS21-035382735

5428095

1108.5

0

-90 100

LS21-015382814

160.4 (EOH)LS21-036382833

5428095

1121.6

0

-90 220

LS21-016382839

200.3 (EOH)LS21-037382900

5428095

1137.3

0

-90 270

LS21-017382876

212.1 (EOH)LS21-038382745

5428051

1106.2

0

-90 110

LS21-018382693

197.3 (EOH)LS21-039382836

5428051

1124.1

0

-90 220

LS21-019382748

LS21-020382788

5428217

139.3 (EOH)LS21-040382839

5428024

1123.7

0

-90 250

1092.9

0

-90

159.5 (EOH)LS21-041382750

LS21-021382831

206.1 (EOH)LS21-042382787

5428022

1111.8

0

-90 220

-90 200

Lone Star Diamond Drilling Program Update

To date, 25 diamond drill holes for 4664m have been completed at Lone Star (Table 1) with full assay results from the first 18 drill holes received.

Batches of core are being delivered to the laboratory on a fortnightly basis with regular results expected over the coming months. Drilling continues 24 hours a day as part of the forty-three hole, ~7,000m diamond drilling program. Drilling is expected to be completed at the Lone Star Copper-Gold Project in Q1-2022 with the phase 1 drill program designed to satisfy three key objectives:

  • - Validate the historical drill hole database and resource model;

  • - Deliver a JORC compliant mineral resource estimate; and

  • - Test for extensions to the historical resource.

Additionally, Mining Plus Pty Ltd have begun resource modelling studies as the Company pushes towards delivering a 2012 JORC-compliant resource in 1H-2022.

Figure 2: Lone Star drill plan map

Table 2: Significant Intercepts from the Lone Star drilling Program

Hole_ID

From

To

Interval

Cu

Au

Ag

(m)

(m)

(m)

%

g/t

g/t

LS21-001

41.5

50.3

9.1

0.6

0.2

3.2

LS21-001

54.9

61.2

6.9

1.2

0.8

12.9

LS21-001

65.8

110.0

44.2

1.3

0.2

4.6

inc.

65.8

88.7

19.8

2.4

0.5

6.7

LS21-001

115.8

138.7

19.1

0.4

NSR

NSR

LS21-001

140.4

162.5

22.1

1.2

0.3

2.2

inc.

140.4

162.5

8.5

2.1

0.8

2.4

LS21-001

198.7

200.9

4.7

0.8

0.3

1.0

LS21-002

46.9

60.8

15.5

3.7

1.8

23.0

inc.

56.7

59.3

2.6

18.5

10.4

106.0

LS21-002

95.1

101.1

6.0

0.4

NSR

2.5

LS21-002

120.7

176.1

53.6

0.8

0.4

2.0

inc.

167.6

176.1

7.6

2.1

1.4

6.2

LS21-002

193.8

194.7

0.9

3.8

1.2

4.0

LS21-002

199.3

200.5

1.2

3.0

1.9

4.0

LS21-002

202.0

203.6

1.6

0.9

1.0

2.0

LS21-003

72.4

77.4

5.0

3.5

1.1

17.5

LS21-003

125.6

147.9

22.3

0.8

0.4

NSR

inc.

133.8

143.3

9.5

1.1

0.5

5.6

LS21-003

155.2

211.0

55.8

0.6

NSR

NSR

inc.

165.9

175.1

9.2

1.0

0.3

NSR

LS21-004

7.0

14.6

7.6

1.2

0.3

NSR

LS21-006

99.7

111.6

11.9

1.0

2.0

3.3

inc.

108.5

110.1

1.6

2.1

11.7

7.0

LS21-007

107.9

125.6

17.7

1.6

2.8

5.9

inc.

112.2

116.3

4.1

5.3

1.5

16.8

inc.

117.4

122.3

4.9

0.5

7.9

2.6

LS21-008

5.5

23.2

17.7

0.6

0.3

NSR

LS21-009

6.4

46.0

39.6

0.4

NSR

NSR

LS21-009

63.4

70.7

7.3

0.5

0.4

NSR

LS21-010

7.8

43.9

37.9

1.0

0.4

4.5

inc.

21.0

33.2

12.2

2.0

1.1

8.8

LS21-010

59.2

80.5

21.3

0.6

NSR

3.3

LS21-010

127.1

138.4

11.3

0.4

NSR

3.2

LS21-011

108.8

111.9

3.1

2.6

1.0

8.6

LS21-011

119.5

127.7

8.2

1.3

1.0

4.7

LS21-012

50.3

50.9

0.6

2.4

1.4

8.0

LS21-013

87.8

96.0

8.2

0.4

0.2

0.5

LS21-014

3.1

10.4

7.3

0.4

0.2

2.5

LS21-015

16.5

71.6

33.2

0.9

0.5

4.5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Marquee Resources Ltd. published this content on 31 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 01 April 2022 01:32:03 UTC.