Saratov Distribution Grids, a branch of IDGC of Volga, PJSC (a member of Rosseti Group of Companies), continues reconstruction of 110/35/10 kV Tatishchevo substation.

The main substation consumers are industrial, social facilities and critical infrastructure of the Tatishchevsky District.

Earlier, new 110/35/10 kV power transformer and 10 kV busbar bridge were installed at this power facility. As part of the 2016 reconstruction, power engineers will install 110 kV sulphur hexafluoride switches, 110 kV motorized disconnecting switches, 110 kV overvoltage limiters, 110 kV current transformers, and 110 kV voltage transformers.

The works on the substation will increase reliability of power supply to consumers and reduce equipment operation costs. Implementation of the following stages will create conditions for technological connection of new consumers to power grids and growth of productive power supply.

IDGC of Volga JSC published this content on 02 September 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 26 September 2016 13:50:04 UTC.

Original documenthttp://www.mrsk-volgi.ru/eng/press_centre/company_news/?id=4911

Public permalinkhttp://www.publicnow.com/view/604B6D4DF8DCE28C4559BE910E941C283D78D7A7