(via TheNewswire)

St-Georges Eco-Mining Corp.
 

MontréalTheNewswire -February 20, 2024St-Georges Eco-Mining Corp.(CSE:SX) (OTC:SXOOF) (FSE:85G1)is thrilled to announce the results of the 2023 drilling program at the company’sManicouagan Critical & Strategic Minerals Project, within the Nitassinan of Pessamit on the Québec North Shore. A total of five holes were completed as well as one hole extension that was deepened from the 2022 drilling program. All for a total of 1,421 meters.

Holes MN23-1 through MN23-3 tested the interpreted eastern astrobleme identified by geophysical responses. The wide spaced holes intersected two to three zones of disseminated nickel-cobalt-chrome mineralization with intermittent Platinum Group Elements values (see table 1).

Thick intercepts up to 87 meters grading 0.28% nickel, 0.11% chrome and 0.012% cobalt from surface in hole MN23-1.

Hole MN23-2 was drilled 360 meters to the southwest of MN23-01.Hole 2 intersected 91.3 meters from surfacegrading 0.24% nickel, 0.29% chrome, 0.011% cobalt and included a 5-meter section grading 0.46% nickel, 0,12% chrome, and 0.012% cobalt with 0.515 g/t combined platinum & palladium.

Hole MN23-03 intersected 56.4 meters grading 0.21% nickel, 0.21% chrome and 0.011% cobalt from surface.

Each hole contained 20 to 24% magnesium within the host rock suggesting an ultramafic origin.

Anomalous PGEs were found intermittently throughout each of the three holes.

Holes 4 and 5 targeted anomalies suggested from the downhole electromagnetic (EM) surveys conducted in early 2023.

MN23-04 did not intersect significant nickel but did encounter a 1-meter interval of anomalous copper at 0.14%,and more importantly, 1 meter grading 1.35 g/t PGE with no correlation to any base metals.This interval may suggest potential for disseminated PGE mineralization elsewhere in the system which has not previously been identified. The EM conductor was not evident within the formations encountered.

Hole MN23-05 intersected two relatively narrow, low-grade zones of nickel-chrome-cobalt at approximately the right elevation indicated as an EM conductor.  However, two thick strong zones (57 and 43 meters) of iron were intersected between the Ni-Cr-Co zones identified above. These values were up to 34% Fe over 1 meter and averaged 17% Fe and 13% Fe percent respectively (see Table 1).  

Due to the significant values in the entire PGE suite (platinum, palladium, iridium, osmium, rhodium and ruthenium), St Georges has pulled samples from historic drilling to reassay for the entire suite of PGEs. Several zones of high-grade mineralization containing Ni-Cu-Co-As were found to contain significant values in the rest of the PGE suite.  

A total of over 600 core samples are being tested for the full PGE suite. The significant added value to mineralization found on the Project may help provide more definition to targeting of future drill holes.

Table 1 - Results from 2023 Drill Program

Hole #

From

To

Thickness

Co ppm

Cr ppm

Mg %

Ni ppm

Pd+Pt ppb

Fe %

MN23-01

2

89

87.0

117

1113

24.8

2797

   
 

65

80

15.0

       

80

 
 

117

148

31.0

119

2874

18.9

1612

36

 
 

233

234

1.0

NSV

NSV

NSV

NSV

NSV

24.4

 

234

320.6

86.6

NSV

NSV

NSV

NSV

26

 

MN23-02

13.7

105

91.3

115

1726

21.7

2396

   

Incl

66

75

         

82

 

Incl

75

80

5.0

152

1200

23.6

4610

515

 
 

114

183

69.0

111

1000

23.2

2496

   
 

189

239

50.0

123

3092

19.7

1650

50

 

MN23-03

19.6

76

56.4

118

2125

20.5

2140

   
 

19.6

29

9.4

       

77

 
 

102

157

55.0

102

1200

20.5

2190

33

 
 

171

203

32.0

126

3312

21

1715

   

MN23-04

41

42

1.0

           
 

58

59

1.0

       

1315

 

MN23-05

67

87

20.0

       

32

 
 

165

171

6.0

88

1300

12.2

970

   
 

191

196

5.0

95

1220

12.5

1000

   
 

102

159

57.0

         

16.8

 

229

272.4

43.4

         

12.8

MN 23-12A

 

NSV

           
 

Herb Duerr, president of St-Georges Eco-Mining, commented:“…I am excited by the latest drill results for Manicouagan. …There is a proven corridor at least 7 kilometers in length and 2 kilometers in width with both disseminated and massive base and precious metals. …Further work shall be carried out in a future drill program that is presently being designed and permitted.”  

The technical contents of this press release were approved by George Yordanov, professional geologist, an independent qualified person as defined by National Instrument 43-101.

 

ON BEHALF OF THE BOARD OF DIRECTORS

‘Herb Duerr’

HERB DUERR
President & CEO

 

1.AboutSt-Georges Eco-Mining Corp.

 

St-Georges develops new technologies to solve some of the most common environmental problems in the mining sector, including maximizing metal recovery and full-circle battery recycling. The Company explores for nickel & PGEs on the Manicouagan and Julie Projects on Quebec’s North Shore and has multiple exploration projects in Iceland, including the Thor Gold Project. Headquartered in Montreal, StGeorges’ stock is listed on the CSE under the symbol SX and trades on the Frankfurt Stock Exchangeunder the symbol 85G1 and as SXOOF on the OTCQB Venture Market for early stage and developing U.S. and international companies. Companies are current in their reporting and undergo an annual verification and management certification process. Investors can find Real-Time quotes and market information for the company onwww.otcmarkets.com

  

Visit the Company website atwww.stgeorgesecomining.com

 

For all other inquiries:public@stgeorgesecomining.com

 

The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.

  

Copyright (c) 2024 TheNewswire - All rights reserved.

Copyright (c) 2024 TheNewswire - All rights reserved., source Press Releases