Vango Mining Limited announced further gold intersections from its open-pit focused drilling campaign at the company's flagship Marymia Gold Project (Marymia, the Project) in the Mid-West region of Western Australia. These results are from five holes at the Ibis open-pit area. As with all the open-pit targets in the current phase of drilling, Ibis was previously mined at a time when the gold price was a fraction of the current price, presenting the opportunity for Vango to find additional mineable resources in its current drilling to add to the Marymia Project's substantial existing resource. Significant gold intercepts have previously been reported from historic drilling below the open-pits, and Vango's 2021 drilling campaign is designed to test for extensions to these resources as well as for repeat structures at depth. Vango's drilling at Ibis has returned four holes with gold greater than 1g/t often within broader mineralized envelopes of >0.3g/t Au. The results confirm the continuity of the mineralized structures below the Ibis open-pit and extend gold mineralization to a greater depth than previously tested. Results include; 7m @ 0.7 g/t Au from 72m in VIBRC0001 Incl 2m @ 1.3 g/t Au from 77m; 2m @ 2.1 g/t Au from 87m in VIBRC0002; 1m @ 1 g/t Au from 108m in VIBRC0002; 1m @ 1.6 g/t Au from 89m in VIBRC0003; 5m @ 0.5 g/t Au from 71m in VIBRC0005 Incl 1m @ 1.3 g/t Au from 71m and 1m @ 1.5 g/t Au from 75m. The mineralization at Ibis sits within steep mineralized shears partially controlled by the contact between a felsic intrusive and mafics. These structures returned multiple high-grade gold intercepts of up to 27.7g/t, in historical drilling from outside the mined area, including: 1m @ 27.7 g/t Au from 24m in IBRC0004; 5m @ 1.2 g/t Au from 26m in IBRC0015 Incl 1m @ 3.9 g/t Au from 30m; 1m @ 2.7 g/t Au from 40m in IBRC0015; 1m @ 1.1 g/t Au from 34m in IBRC0016; 3m @ 1.3 g/t Au from 44m in IBRC0016 Incl 1m @ 3.0 g/t Au from 46m; 1m @ 1.1 g/t Au from 52m in IBRC0016; 2m @ 4.3 g/t Au from 38m in IBRC0019; 2m @ 4.1 g/t Au from 7m in IBRC0073; 5m @ 19.9 g/t Au from 45m in IBRC0079; 4m @ 3.4 g/t Au from 29m in IBRC0125. The results from the Ibis open-pit will be reviewed to establish their potential to deliver additional economic resources to the Marymia resource base, and further drilling will be undertaken if warranted. 2021 Drilling Campaign Progress and Next Steps: Vango is targeting 11 priority open-pits in its 2021 drilling campaign. Drilling is designed to add resources to the substantial existing Marymia resource base, and to deliver `critical mass' to Marymia's resource base to support a proposed stand-alone mining operation at the Project. The first phase of drilling in all 11 open pits has now been completed and consisted of 8,914 metres of RC drilling across 56 holes. All results have now been reported from first-phase drilling at the Skyhawk, Parrot, Apollo, Prickleys and Ibis open pits, and results from drilling at the remaining 6 open-pits will be progressively released as they become available. Vango has completed second phase drilling at two of the 11 priority open-pits (Skyhawk and Parrot). Second phase drilling will be conducted at all targets that deliver positive results in the completed first round of drilling, to test for further extensions of gold mineralization to add to the Marymia resource base.