Vancouver - Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) ('Skeena' or the 'Company') is pleased to announce the final gold-silver assays from the 2019 Phase I surface drilling program at the Eskay Creek Project ('Eskay Creek') located in the Golden Triangle of British Columbia.

Four ground-based surface drill rigs were utilized for the 2019 Phase I program in the 21A, 21E and HW Zones to infill and upgrade areas of Inferred resources to the Indicated classification. A total of 14,266 metres over 209 holes were drilled. Drill hole results reported in this release are from the 21E and HW Zones. Reference images are presented at the end of this release as well as on the Company's website.

2019 Drilling Demonstrates Continuity and Exceptional Silver Grades

The 2019 Phase I infill program at Eskay Creek continues to demonstrate the excellent continuity of the current resource model which is derived largely from historical drilling. Phase I infill drilling within the 21E Zone, which is located on the eastern flank of the Eskay deposits, has correlated extremely well with the historical drilling with respect to grades, widths and spatial distribution of mineralization.

Initial drilling within the HW (Hanging-Wall) Zone has not only corroborated the current resource model but has located additional mineralization of equivalent tenor as confirmed by drill hole SK-19-245 which intersected 1.63 g/t Au, 62 g/t Ag (2.45 g/t AuEq) over 16.21 metres.

Situated 20 metres east of this expanded mineralization, drill hole SK-19-246 intersected extremely high-grade silver mineralization of 13.24 g/t Au, 701 g/t Ag (22.59 g/t AuEq) over 14.33 metres including 5.18 g/t Au, 5,860 g/t Ag (83.31 g/t AuEq) over 0.90 metres. This intercept was predicted by the resource model. Drill intercepts in the HW Zone are located less than 20 metres below surface.

Current Status - Eskay Creek Drilling

Four ground-based drill rigs are now operational at the Eskay Creek Project continuing the Phase I infill program. Exploratory drilling is scheduled to commence in the coming weeks.

About Skeena

Skeena Resources Limited is a junior Canadian mining exploration company focused on developing prospective precious metal properties in the Golden Triangle of northwest British Columbia, Canada. The Company's primary activities are the exploration and development of the past-producing Eskay Creek mine, which contains a combined Indicated and Inferred 4Moz, 4.4 g/t gold-equivalent open-pit resource. The Company recently completed a Preliminary Economic Assessment (PEA) on Eskay Creek which highlights an after-tax NPV5% of C$638M, 51% IRR and a 1.2-year payback. Skeena is also exploring the past-producing Snip gold mine.

Quality Assurance - Quality Control

Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re-analyzed using a 50g fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than 10,000ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements made and information contained herein may constitute 'forward looking information' and 'forward looking statements' within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet management's expectations. Forward-looking statements and information may be identified by such terms as 'anticipates', 'believes', 'targets', 'estimates', 'plans', 'expects', 'may', 'will', 'could' or 'would'. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.

Contact:

Tel: (604) 684-8725

Fax: (604) 558-7695

Email: info@skeenaresources.com

(C) 2020 Electronic News Publishing, source ENP Newswire