Aldebaran Resources Inc. reported assays from two holes at the Altar copper-gold project located in San Juan, Argentina. The Company’s field season has concluded at the Altar project with four drill holes completed. Assays results are pending from the remaining two holes. ALD-21-217 was collared at Altar Central, returning 63 m of 0.94% CuEq in near surface supergene mineralization, and 584 m of 0.52% CuEq, including 158 m of 0.71% CuEq, in hypogene mineralization, extending the hypogene zone approximately 150 m to the west and 500 m below the current resource estimate. ALD-21-217 ended in 16 m of 0.91% CuEq mineralization including high-grade molybdenum (1,263 ppm Mo). ALD-21-218 was collared at Altar East, returning 742 m of 0.32% CuEq in hypogene mineralization.[Results from two additional holes are pending, including one in the QDM/Radio Porphyry area and an additional hole at Altar Central.