Alpha Exploration Ltd. announced initial drilling results from a 10,000m drill program underway on its Aburna Gold Prospect ("Aburna") on the Company's 100% owned, 771 km2 Kerkasha Project located in Eritrea. Drilling consists of both reverse-circulation ("RC") drilling and diamond drilling ("DD"). Exploration to date by Alpha on the project has defined six primary areas of interest, and has established significant high-grade gold mineralised systems at Central Area, Hill 52 and Northeast Area.

Highlights: 20m @ 2.82 g/t Au, 22m @ 1.71 g/t Au and 24m @ 1.17 g/t Au reported from Central Area 2m @ 13.11 g/t Au and 1m @ 14 g/t Au from partially completed holes from Northeast Area Drilling defines significant shallow gold mineralised lens 300m long, fully open at Central Area. Plunging geometry of gold mineralization shoots at Central Area confirmed. Further drilling underway at Central, Hill 52 & Northeast area prioritising similarly oriented gold shoots.

Drill Program. The Company commenced the current drill program in December 2023. To date, 33 holes for 5,188 metres have been drilled at Central Area (13 holes), Hill 52 (11 holes) and Northeast Area (9 holes).

Assay results have been received from 14 of these 33 holes.