Golden Predator Mining Corp. announced the start of its 2020 drill program at its licensed 100%-owned Brewery Creek mine project ?located approximately 55 km by road from Dawson City, Yukon. The drill program, now underway, will consist of more than 3,000 m of exploration drilling including: Wide spaced exploration drilling on new large intrusive porphyry system. Two gold zones--the Classic and Lonestar Zones "have been identified by outcrop, geophysics, surface sampling and previous drilling which was limited to road access along the western margin. This intrusive has a surface expression in excess of 20km2. Initial column leach tests have indicated that this intrusive-hosted mineralization is leachable to at least 200 m in depth. In-fill drilling within a 400 m gap between the Lucky resource area and the Keg resource to increase the density of 2019 drilling, confirm continuity of mineralization between the two deposits and increase resources. The goal is to incorporate the Lucky resource into the much larger Keg pit shell for mine planning now in progress as a part of the Brewery Creek Bankable Feasibility Study (BFS).