Canadian Platinum Corp. announced that personnel are on site to commence the initial phase of exploration work on the Cook Gold Project in northern Nevada. As reported December 21, 2017, the Company engaged Axiom Exploration Ltd. (Axiom) to design and implement the first phase of exploration on the property. Axiom is now in the field and over the next few weeks will supervise contracted airborne geophysical and airborne hyperspectral surveys, followed by geological mapping with a focus on alteration and structure, geochemical surveys, ground geophysics, verification of historical sampling, prospecting and new sampling, and data compilation and interpretation to select drill targets. The 70%-owned Cook Gold Project consists of 88 lode claims located 100 km northwest of Winnemucca, Nevada. Historical surface and underground sampling outlined a 2.1 km X 0.6 km corridor hosting significant gold, silver and copper mineralization. Within the mineralized corridor, there are 5 historical mine workings where near-surface oxidized mineralization was mined. The current work program will focus on further exploring and better delineating the mineralization within the corridor.