6 March 2017
  • The Phase 1 drilling program at San Jorge is now complete with assay results of 144 holes received to date.
  • Drilling has continued to intersect encouraging grades of nickel mineralisation.
  • Key highlights from the drilling include:
    • 15.4m @ 1.07% Ni from 2.5m including 3.6m @ 1.65% Ni from 6.7m
    • 12.5m @ 1.22% Ni from 2.5m including 6.1m @ 1.59% Ni from 7.5m
    • 8.5m @ 1.12% Ni from 2.0m including 2.0m @ 1.7% Ni from 8.0m
    • 10.5m @ 1.11% Ni from 1.5m including 3.5m @ 1.58% Ni from 8.5m
  • Drilling results will be used to construct a Mineral Resource estimate in early 2017.
  • Mining lease application awaiting government approval.

Axiom Mining Limited ('Axiom' or 'the Company') is pleased to announce further results from the drill program at the Isabel Nickel Project on San Jorge Island in the Solomon Islands.

Axiom has targeted an area within the San Jorge tenement that presents optimal logistical characteristics of an initial mining DSO operation. Results from the drilling program will be used to deliver a Mineral Resource estimate in early 2017. Assay results for further holes remain outstanding.

The Phase 1 of the program at San Jorge has been successfully concluded with the 50 by 50m drill pattern complete across the initial area of focus. The definition program included selected 25m infill holes as well as sterilisation holes on the edge on the known mineralised zone to assist with initial mining boundaries to ensure efficiency in proceeding to stockpiling and mining.

With the completion of Phase 1 of the program, the Company is currently focused on key elements to commence mining including licencing and permitting. Further to this Axiom is also assessing the additional historically modelled mineralised areas over the remainder of the tenement, as well as new exploration targets, that occur at San Jorge recently identified. Significant potential for additional saprolite mineralisation occurs at San Jorge that warrants modern testing - this will likely to occur parallel to mining operations.

Phase 1 of the drilling program was designed to establish an initial area for mining, satisfy criteria for the submission of a mining lease application and produce an initial JORC Mineral Resource. Drilling activities will now pause while waiting the grant of a mining license at San Jorge although some other exploration and development activities will continue during March. Phase 2 of the Resource and exploration drilling program is planned to commence in tandem with start-up mining activities upon grant of the mining lease.

The project location is indicated in Figure 1 with drilling details provided in Figure 3 and Table 1.

Figure 1 San Jorge drilling location overview Figure 2 Drilling and sampling operations Table 1 New assay results from San Jorge drilling

Hole ID Entire Limonite Saprolite Easting* Northing* RL EOH intersection^ intersection# intersection~ (m)(m)

SJ-090

7.7m @ 0.77% Ni

from 2m

572998

9059400

208

9.7

SJ-091

9m @ 0.86% Ni from 2m

1m @ 1.32% Ni from 9m

572950

9059600

183

12.7

SJ-092

1.1m @ 0.88% Ni

from 0.9m

572615

9059700

202

4.2

SJ-093

3.4m @ 0.93% Ni

from 7m

572904

9059654

184

10.4

SJ-094

4m @ 0.79% Ni from 2m

573002

9059299

216

7.2

SJ-095

6m @ 1.13% Ni from 2m

3m @ 1.47% Ni from 5m

572943

9059700

167

11.4

SJ-096

2m @ 1.09% Ni from 3m

1m @ 1.23% Ni from 4m

573004

9059196

213

6.8

SJ-097

2.7m @ 0.84% Ni

from surface

572902

9059706

169

6.0

SJ-098

2m @ 0.7% Ni from 2m

572953

9059202

217

5.2

SJ-099

10m @ 1.1% Ni from 1m

4m @ 1.2% Ni from 3m

2m @ 1.52% Ni from 7m

572903

9059404

214

12.5

SJ-100

3.3m @ 0.91% Ni

from 4m

572944

9059663

176

8.2

SJ-101

11m @ 1.26% Ni

from 2m

7m @ 1.49% Ni from 5m

572891

9059450

199

14.1

SJ-102

3m @ 0.82% Ni from surface

572850

9059650

176

4.7

SJ-103B

No significant intersection

572845

9059687

170

6.0

SJ-104

10m @ 1.03% Ni

from surface

2m @ 1.35% Ni from 6m

1m @ 1.38% Ni from 8m

572799

9059902

145

12.0

SJ-105

9m @ 1.18% Ni from 2m

3m @ 1.5% Ni from 6m

2m @ 1.42% Ni from 9m

572901

9059505

202

14.5

SJ-106

10m @ 0.94% Ni

from surface

572602

9059296

134

11.0

SJ-107

9.2m @ 1.07% Ni

from 2m

2m @ 1.4% Ni from 7.5m

572904

9059554

193

17.2

SJ-108

5m @ 1% Ni from surface

1m @ 1.26% Ni from 2m

572598

9059248

139

6.5

SJ-109

8.9m @ 1% Ni from 3m

3.1m @ 1.24% Ni

from 5m

1.3m @ 1.34% Ni

from 8.1m

572645

9059253

167

12.2

SJ-110

8.5m @ 1.12% Ni

from 2m

2m @ 1.7% Ni from 8m

572647

9059195

195

10.5

SJ-111

No significant intersection

572698

9059147

184

5.6

SJ-112

2m @ 0.71% Ni from 1m

572650

9059454

205

5.8

SJ-113

No significant intersection

572648

9059547

200

2.4

Hole ID

Entire intersection^

Limonite intersection#

Saprolite intersection~

Easting*

Northing*

RL

(m)

EOH

(m)

SJ-114

No significant intersection

572654

9059500

202

3.1

SJ-115

No significant intersection

572600

9059446

213

1.7

SJ-116

2.8m @ 0.86% Ni

from 4.5m

572354

9059698

216

11.5

SJ-117

3.5m @ 0.76% Ni

from 1.5m

572405

9059699

218

6.5

SJ-118

8.1m @ 0.81% Ni

from 2.5m

572352

9059746

220

13.4

SJ-119

3.8m @ 1.08% Ni

from 3.6m

572399

9059752

215

11.2

SJ-120

19.3m @ 1.04% Ni

from 2m

6m @ 1.39% Ni from 6.6m

572303

9059747

212

23.3

SJ-121

2.7m @ 0.73% Ni

from surface

572405

9059802

219

4.2

SJ-122

No significant intersection

572450

9059702

204

4.5

SJ-123

1.2m @ 0.7% Ni

from 3.2m

572451

9059747

209

5.2

SJ-124

15.4m @ 1.07% Ni

from 2.5m

2.2m @ 1.29% Ni

from 4.5m

3.6m @ 1.65% Ni

from 6.7m

572351

9059802

207

18.5

SJ-125

8.8m @ 1.05% Ni

from surface

2m @ 1.5% Ni from 4.5m

1.5m @ 1.29% Ni

from 6.5m

572298

9059802

222

8.8

SJ-126

12.3m @ 1.19% Ni

from 1.2m

3.2m @ 1.33% Ni

from 6.3m

3.4m @ 1.46% Ni

from 9.5m

572351

9059853

206

13.8

SJ-127

10.5m @ 1.11% Ni

from 1.5m

3.5m @ 1.58% Ni

from 8.5m

572301

9059849

223

14.2

SJ-128

1.8m @ 0.69% Ni

from 1.5m

572495

9059748

187

4.2

SJ-129

6.9m @ 0.92% Ni

from 0.9m

572352

9059903

187

7.8

SJ-130

1.7m @ 0.72% Ni

from surface

572493

9059700

183

3.0

SJ-131

4.1m @ 0.78% Ni

from surface

572486

9059800

197

4.7

SJ-132

4.4m @ 0.86% Ni

from 1.5m

572441

9059797

207

7.0

SJ-133

10.7m @ 1.27% Ni

from surface

2m @ 1.8% Ni from 4.3m

3.7m @ 1.47% Ni

from 6.3m

572306

9059900

201

11.1

SJ-134

5.1m @ 1.08% Ni

from 3.5m

2.1m @ 1.46% Ni

from 5.5m

572449

9059851

185

9.2

SJ-135

5.1m @ 0.78% Ni

from 0.9m

572353

9059952

189

6.8

SJ-136

5m @ 0.88% Ni from 0.9m

572399

9059840

205

5.9

SJ-137

6m @ 0.97% Ni from 1.5m

572396

9059948

184

7.5

Axiom Mining Limited published this content on 06 March 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 06 March 2017 01:03:06 UTC.

Original documenthttp://www.axiom-mining.com/irm/PDF/2744_0/IsabelNickelProjectSanJorgedepositdrillingresults

Public permalinkhttp://www.publicnow.com/view/BBC46A067C0C9F970AF26640BA1A4D0613187D50