Azure Minerals Limited announced that seven drill holes have all intersected broad zones of nickel-copper (Ni-Cu) sulphide mineralisation within the VC-07 mineralised corridor on the Andover Ni-Cu Project. To date, Azure has completed 49 diamond drill holes for a total of 21,943m at Andover, with 41 holes drilled at VC-07 (34 holes at VC-07 East and 7 holes at VC-07 West) and 8 holes drilled at the VC-23 prospect. VC-07 WEST The first hole drilled into VC-07 West, ANDD0041, intersected two substantial zones of Ni-Cu sulphide mineralisation: 36.6m of matrix and heavily disseminated Ni-Cu sulphides from 428.15m; and 28.9m of matrix, stringer and disseminated Ni-Cu sulphides from 644.1m. Follow-up drill holes ANDD0042, 0045, 0048 and 0049 targeted mineralised extensions along-strike and above and below ANDD0041 Hole ANDD0042 drilled beneath the targeted EM conductor plate, intersecting disseminated Ni-Cu sulphide mineralisation. The other three holes all intersected broad, and in some cases multiple, zones of semi-massive, matrix and heavily disseminated Ni-Cu sulphide mineralisation. These mineralised intersections coincide with the modelled locations of the EM conductor plates and subsequent Down Hole Transient Electromagnetic (DHTEM) surveys confirmed the presence of in-hole EM anomalies in association with the mineralisation. ANDD0045 intersected: 4.0m of semi-massive and matrix Ni-Cu sulphides from 486.6m downhole; and 6.6m of semi-massive and disseminated Ni-Cu sulphides from 602.5m downhole. ANDD0048 intersected: 16.8m of heavily disseminated Ni-Cu sulphides from 366.7m. ANDD0049 intersected: 7.5m of matrix and heavily disseminated Ni-Cu sulphides from 419.7m downhole; and 17.2m of semi-massive, matrix and heavily disseminated Ni-Cu sulphides from 472.4m downhole. DHTEM surveys are consistently carried out in completed VC-07 West drill holes, resulting in the identification of numerous EM conductor plates. In-hole conductors are clearly associated with the visual Ni- Cu sulphide mineralisation, confirming the strong relationship between the mineralisation and conductance. In addition, the surveys have identified multiple off-hole conductors that are clear and strong (up to 25,000 All conductors have been modelled to have a steep northerly dip which is consistent with the dip of all mineralised zones drilled to date. These off-hole conductors have been prioritised as immediate drill targets. Further drilling is continuing at VC-07 West with the focus on testing the DHTEM conductors and following the mineralisation along strike to the east and west, up-dip closer to surface, and deeper down-dip.