Bitterroot Resources Ltd. and its joint venture partner Below Exploration Inc. plan to resume drilling at the LM nickel-copper property in the Upper Peninsula of Michigan during the week of January 10, 2022. Drilling will focus on the SE quadrant of the LM intrusion, where vertical holes will test the keel of the LM intrusion down-plunge from high-grade nickel-copper-bearing massive sulphide, at depths below 250 metres. The first hole to be drilled (LM 22-22) will be located approximately 25 metres east of hole LM 20-07, which intersected 0.75 metres grading 5.16% nickel and 1.18% copper and approximately 38 metres northeast of hole LM 21-14, which intersected 1.07 metres grading 4.09% nickel and 0.78% copper.

The position of these mineralized intervals on the basal contact is shown in a slide presentation on the LM Property. Exploration of the LM Project is being funded by project operator Bitterroot Resources Ltd. (51%) and its privately-owned joint venture partner Below Exploration Inc. (49%).