Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 7 - outage
Unit 2 is in Mode 1 - startup after refuelling, Reactor power is 65 %, Turbine generator output - 285 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe

Electricity production since the beginning of the year: 13 025 443 MWh.

Jiří Bezděk , Spokesman of the ČEZ Group, Nuclear Power Plant Dukovany

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 26 November 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 November 2020 08:48:04 UTC