Buenos Aires, March 4th, 2024
Results for fiscal year ended on December 31st, 2023
Compañía de Transporte de Energía Eléctrica en Alta Tensión Transener S.A. ("Transener" or the "Company") announces the results for fiscal year ended on December 31st, 2023
Transener, Argentina's leading electricity transmission company, announces the results for fiscal year ended on December 31st, 2023.
Main results for fiscal year ended on December 31st, 2023, restated in constant currency at December, 20231
Consolidated revenues of AR$ 130,452 million, 32.8% higher than the
AR$ 98,235 million for last year, due to the tariff adjustments as from
January, August and November, 2023.
Consolidated EBITDA2 of AR$ 30,449 million, 34.9% higher than the AR$ 22,565 million for last year, mainly due to the increase of 32.8% in revenues, partially offset by an increase of 22.7% in operating and administrative expenses.
Consolidated profit attributable to the owners of the company of
AR$ 6,578 million, 23.5% higher than the AR$ 5,325 million for last year.
Main results for the Fourth Quarter of 2023
Consolidated revenues of AR$ 27,373 million, 38.6% higher than the AR$ 19,746 million for the same period last year, due to the tariff
adjustments as from January, August and November, 2023.
Consolidated negative EBITDA2 of AR$ 11,285 million, 299.0% higher than the AR$ 2,828 million for the same period last year, mainly due to an increase in costs of maintenance equipment for the repair of synchronous compensators No. 3 and 4 in Ezeiza Substation.
Consolidated loss attributable to the owners of the company of AR$ 12,429 million, 368.7% higher than the AR$ 2,652 million for the same period last year.
1Expressed in constant currency, in accordance with IAS 29.
2Consolidated EBITDA represents consolidated operating results before depreciation.
1
1. Financial Situation
As of December 31st, 2023, Transener maintains a principal balance of AR$ 194 million from a loan for working capital of AR$ 1,000 million, entered into with the Banco de la Nación Argentina in July 2021.
Regarding Transener's ratings, Fix Scr S.A. Credit Rating Agency maintained the long-term issuer rating of A+ (arg) with stable outlook.
2. Tariff Situation
On December 29th, 2022, the ENRE, in order to maintain in 2023 the purchasing power of the revenues granted by Resolutions No. 147/2022 and 148/2022, through Resolutions No. 698/2022 and 702/2022 set the hourly values of remuneration as from January 1st, 2023, establishing an increase of 154.5% and 154.1% for Transener and Transba, respectively, over the tariff values of February 2022.
On April 20th, 2023, the ENRE, under Resolution No. 364/2023, initiated the Full Tariff Review process for the electricity transmission companies, in compliance with Laws No. 24,065 and 27,541, setting a term of 30 days for the elaboration of the guidelines and of the schedule for its development.
On May 29th, 2023, the ENRE, under Resolution No. 421/2023, approved the Program for the Full Tariff Review for electricity transmission in the year 2023 and 1st quarter of 2024, in which it is foreseen that during September and October 2023, the ENRE will notify the schedule and information requirements. The ENRE notified the first information requirement on October 26th, 2023, mainly related with a description of the Transmission System facilities, expansions in progress, investment plans and saturation of corridors status, among others. On October 27th, 2023, Transener and Transba answered that, although the information requirement will be fulfilled properly, it is necessary for the ENRE to establish: i) the complete schedule of the FTR process; ii) the regulatory, economic and financial criteria on which the ENRE will run the process, iii) proposals made for the First Management Period.
On September 8th, 2023, the ENRE, in order to maintain the purchasing power of the revenues granted by Resolutions No. 147/2022 and 148/2022, through Resolutions No. 661/2023 and 660/2023 set the hourly values of remuneration as from August 1st, 2023, establishing an increase of 20.9% and 20.84% for Transener and Transba, respectively, over the tariff values of January 2023. Likewise, through Resolutions No. 781/2023 and 780/2023 the ENRE set the hourly values of remuneration as from November 1st, 2023, establishing an increase of 37.33% and 38.44% for Transener and Transba, respectively, over the tariff values of August 2023.
On December 16th, 2023, through Decree No. 55/2023, the National Executive Power declared the emergency of the National Energy Sector related to the generation, transmission and distribution of electric energy under federal jurisdiction.
Art.3 of the aforementioned decree determined the beginning of the Tariff Review according to art. 43 Law No. 24,065 regarding the generation, transmission and distribution of electric energy under federal jurisdiction, establishing that the entry into force of the resulting tariff schedules should not exceed December 31st, 2024.
On January 2nd, 2024, under Resolution No. 3/2024, the ENRE scheduled a public hearing which was held on January 29th, 2024, in order to inform and listen to opinions regarding the proposals of the concessionaires of the public electric energy transmission service for a temporary adjustment of tariffs, prior to defining the rates to be applied by the concessionaires.
Finally, the ENRE, by Resolutions No. 104/2024 and 105/2024, granted the hourly values of remuneration as from February 19th, 2024, establishing an increase of 179.7% and 191.1% for Transener and Transba, respectively, over the tariff values of November 2023. Likewise, it was determined a tariff adjustment formula, based on salaries rates, wholesale prices and consumer prices, to be applied monthly as from May 2024.
2
3. Operating Information
The Company continues to carry out the execution of the investment plan, maintaining as of December 31st, 2023 commitments for the acquisition of capital expenditures for an amount of approximately AR$ 29,800 million.
Transener, as the concessionaire of the extra high voltage electric power transmission network, is in charge of the supervision of the expansions of the network.
Here follows the most significant works in progress under Transener's supervision:
-
Federal Plan for Transmission Works
Electrical Interconnection in 500kV Bahía Blanca - Mar del Plata, Connection in 132kV to Villa Gesell and Complementary Works - North Trench
The energisation and commissioning of the 150 MVar reactor bars of the new 500/132kV Vivoratá Substation is in progress, already with the eight 500/132kV outputs and the 500kV EHVL in service since June 2023.
Fields 2x132kV El Bracho Substation
Fields 19 and 20 new outputs in 132kV for a double circuit between El Bracho and Villa Quinteros. - Works under SE Resolutions No. 1/2003 and 821/2006
Ezeiza Substation - Installation of shunt capacitive compensation banks
Output on Transener's side in 220 kV to EDESUR's side, where the banks will be installed.
Alicurá Substation - New output in 132 kV
Output to the new Dina Huapi Substation, including command and expansion of SCADA system. - Other works to be undertaken by the Wholesale Electricity Market (WEM) Agents
Río Santa Cruz Hydroelectric Exploitation
Cóndor Cliff and La Barrancosa Hydroelectric Power Plants- 500kV EHVL and Complementary Works Anticipated detailed engineering revision and inspections in factories.
Resistencia Substation - Fields 01 and 02 outputs in 132kV Adequacy of both line outputs with equipment update.
Cobos Substation - DAG Hub Node (Puna Solar-AltiplanoSolar-Cauchari Solar Generators) Installation required by DAG (Automatic Generation Disconnection) system and covered by the photovoltaic generators mentioned above.
Puerto Madryn Substation Expansion - Transformation Capacity (Goldwing Loma Blanca VI Eolic Park)
Installation of a 600 MVA transformer bank in 500/138/34.5kV (T3PY).
Rosario Oeste Substation Expansion (for EPESF) - Output in 132 kV DT HVL to Godoy Substation Commissioning of the Field N° 4 of the 132kV Rosario Oeste Substation yard for line output to Provincias Unidas, by underground cable.
Chaco Substation Expansion - Second 300MVA Transformer New transformation field for the backup transformer.
Gran Mendoza Substation - Outputs in 200 kV to Godoy Cruz New outputs in 200 kV for EDEMSA.
3
Here follows the most significant works in progress under Transba's supervision:
- Other works to be undertaken by the Wholesale Electricity Market (WEM) Agents
South Substation
New South Substation in Bahía Blanca with 2 45/30/45 MVA transformers in 132/33/13.2kV and opening of Chañares - Petroquímica 132kV HVL.
Ayacucho Substation.
New Ayacucho Substation with capacity of 2x30/20/30 MVA, which will be connected to the Tandil - Las Armas 132kV HVL, the construction of a 3.4 km double-circuit, and new outputs 4x33 kV + 4x13.2kV.
Numancia Substation
New Numancia 33/132kV Substation, to which it will be connected the 160 MW Eolic Park La Elbita (36 wind turbines of 4.2 MW), sectioning Tandil - Necochea HVL, 42 km from Tandil.
North San Nicolás Substation
Electromechanical assembly of the new North San Nicolás Substation 132/33/13.2kV - 2x40/40/40 MVA + 6Px33-8Px13. Sections the San Nicolás - General Lagos 132kV HVL, and a third connection of the lines from Laminados Industriales.
La China Substation
New substation to connect the Vientos Olavarria 100.8 MW Eolic Park, sectioning the Olavarría - Henderson HVL.
Olavarría - Barker 2 HVL modification
Modification of the Olavarria - Barker 2 HVL, transmission towers N° 162 and N° 178 incorporating 3.5 km of 132kV HVL.
Business Development
Given its position as a leader in electricity transmission, Transener is involved in the supply of operation and maintenance services, engineering, testing and commissioning of lines and substations for new works or for the expansion of existing works in the 500kV system. Likewise, it maintains installations of communications that are affected by dark fiber lease contracts.
Transener maintains its main contracts with the following customers:
- Minera Alumbrera Ltd.
- AES Argentina Generación S.A.
- Nucleoeléctrica Argentina S.A.
- Silica Networks Argentina S.A.
- Capex S.A.
4
Rate of failures
The following charts show the rate of failures of Transener and Transba as from December 2018.
Transener and Transba Concession Agreements state a maximum rate of failures of 2.5 and 7.0 outages per 100 km over a 12-month period, respectively.
Transener | ||||||||||||||||||||||||
3,0 | ||||||||||||||||||||||||
2,5 | ||||||||||||||||||||||||
2.5 FAILURE LIMIT | ||||||||||||||||||||||||
2,0 | ||||||||||||||||||||||||
1,5 | COMPANY | |||||||||||||||||||||||
FAILURES | ||||||||||||||||||||||||
1,0 | ||||||||||||||||||||||||
0,5 | ||||||||||||||||||||||||
0,0 | MARCH JUNE SEPTEMBER DECEMBER | MARCH JUNE SEPTEMBER DECEMBER | MARCH JUNE | SEPTEMBER | JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER | MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER | ||||||||||||||||||
DECEMBER | DECEMBER | JANUARY | FEBRUARY | |||||||||||||||||||||
2018 - | 2019 - | 2020 - | 2021 - | 2022 - | 2023 - | |||||||||||||||||||
Transba | ||||||||||||||||||||||||
8,0 | ||||||||||||||||||||||||
7,0 | ||||||||||||||||||||||||
6,0 | ||||||||||||||||||||||||
5,0 | 7.0 FAILURE LIMIT | |||||||||||||||||||||||
4,0 | COMPANY FAILURES | |||||||||||||||||||||||
3,0 | ||||||||||||||||||||||||
2,0 | ||||||||||||||||||||||||
1,0 | ||||||||||||||||||||||||
0,0 | MARCH JUNE | SEPTEMBER DECEMBER | JUNE SEPTEMBER DECEMBER | JUNE | SEPTEMBER DECEMBER | FEBRUARY MARCH | APRIL | MAY | JUNE JULY | AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY | FEBRUARY | APRIL | MAY JUNE | JULY AUGUST | SEPTEMBER OCTOBER | NOVEMBER | ||||||||
DECEMBER | MARCH | MARCH | JANUARY | MARCH | DECEMBER | |||||||||||||||||||
2018 - | 2019 - | 2020 - | 2021 - | 2022 - | 2023 - | |||||||||||||||||||
5 |
4. Significant Financial Information
4.1 Consolidated Statements of Operations
Fiscal year ended on | Three-month period ended on | |||
In AR$ M M | December 31st | December 31st | ||
2023 | 2022 | 2023 | 2022 | |
Revenues | 130,452 | 98,235 | 27,373 | 19,746 |
Operating costs | (101,986) | (83,510) | (36,836) | (23,752) |
Gross profit/(loss) | 28,465 | 14,725 | (9,463) | (4,005) |
Administrative expenses | (13,435) | (10,572) | (5,208) | (3,479) |
Other operating (expenses)/income, net | (1,224) | 1,620 | (557) | 399 |
Operating income/(loss) | 13,807 | 5,772 | (15,228) | (7,086) |
Finance income | 37,023 | 17,531 | 12,781 | 6,613 |
Finance costs | (11,972) | (10,395) | (3,361) | (2,857) |
Other financial results | (1,458) | 178 | (507) | 486 |
Loss on net monetary position | (26,204) | (4,634) | (12,001) | (381) |
Profit/(loss) before tax | 11,196 | 8,453 | (18,316) | (3,225) |
Income tax | (4,618) | (3,128) | 5,887 | 574 |
Profit/(loss) for the year from continuing operatio | 6,578 | 5,325 | (12,429) | (2,652) |
Profit/(loss) for the year attributable to : | ||||
Owners of the company | 6,578 | 5,325 | (12,429) | (2,652) |
Total for the year | 6,578 | 5,325 | (12,429) | (2,652) |
Other comprehensive results | ||||
Profit/(loss) for the year | 6,578 | 5,325 | (12,429) | (2,652) |
Other comprehensive results for the year, net of | ||||
taxes | (180) | (998) | (180) | (998) |
Comprehensive profit/(loss) for the year | 6,398 | 4,327 | (12,609) | (3,649) |
Comprehensive profit/(loss) for the year | ||||
attributable to : | ||||
Owners of the company | 6,398 | 4,327 | (12,429) | (2,652) |
Total for the year | 6,398 | 4,327 | (12,429) | (2,652) |
EBITDA | 30,449 | 22,565 | (11,285) | (2,828) |
Acquisition of property, plant and equipment | 20,298 | 12,726 | 5,936 | 4,170 |
Depreciation | 16,642 | 16,793 | 3,943 | 4,258 |
6
4.2 | Consolidated Balance Sheets | |||
In AR$ MM | As of December 31st, | As of December 31st, | ||
2023 | 2022 | |||
ASSETS | ||||
Non-current assets | ||||
Property, plant and equipment | 278,910 | 275,838 | ||
Inventories | 13,519 | 11,538 | ||
Other receivables | 3,495 | 2,628 | ||
Total Non-current assets | 295,924 | 290,004 | ||
Current assets | ||||
Trade accounts receivable | 28,381 | 21,047 | ||
Other receivables | 10,628 | 6,499 | ||
Investments at fair value | 3,543 | 3,740 | ||
Cash and cash equivalents | 13,263 | 16,005 | ||
Total Current assets | 55,815 | 47,290 | ||
TOTAL ASSETS | 351,739 | 337,295 | ||
LIABILITIES | ||||
Non-current liabilities | ||||
Loans | - | 606 | ||
Contract liabilities | 2,944 | 3,293 | ||
Deferred tax liabilities | 44,453 | 46,199 | ||
Employee benefits payable | 6,656 | 6,758 | ||
Trade accounts payable | 640 | 629 | ||
Total Non-current liabilities | 54,693 | 57,484 | ||
Current liabilities | ||||
Provisions | 913 | 1,054 | ||
Loans | 250 | 1,331 | ||
Income tax payable | 6,775 | 5,362 | ||
Taxes payable | 755 | 1,439 | ||
Payroll and social securities taxes payable | 11,242 | 11,398 | ||
Employee benefits payable | 1,664 | 1,689 | ||
Contract liabilities | 210 | 235 | ||
Trade accounts payable | 22,782 | 11,244 | ||
Total Current liabilities | 44,591 | 33,753 | ||
TOTAL LIABILITIES | 99,284 | 91,237 | ||
EQUITY | ||||
Share capital | 445 | 445 | ||
Share capital adjustment | 117,948 | 117,948 | ||
Legal reserve | 11,374 | 11,108 | ||
Optional reserve | 6,713 | 5,501 | ||
Voluntary reserve | 116,291 | 112,444 | ||
Other comprehensive results | (6,893) | (6,713) | ||
Retained earnings | 6,578 | 5,325 | ||
TOTAL EQUITY | 252,456 | 246,058 | ||
TOTAL LIABILITIES AND EQUITY | 351,739 | 337,295 | ||
7
4.3 | Additional information | ||||
Fiscal year ended on | Three-month period ended on | ||||
In AR$ M M , nominal values | December 31st | December 31st | |||
2023 | 2022 | 2023 | 2022 | ||
Revenues | 69,625 | 23,080 | 22,750 | 6,031 | |
Operating and administrative expenses | (64,369) | (19,513) | (34,877) | (7,215) | |
Other operating (expense)/income, net | (65) | 448 | 79 | 137 | |
Operating profit/(loss) | 5,192 | 4,015 | (12,047) | (1,046) | |
EBITDA | 6,107 | 4,546 | (11,763) | (886) | |
Acquisition of property, plant and equipment | 11,608 | 3,126 | 4,848 | 1,279 | |
Depreciation | 915 | 530 | 285 | 160 |
5. Analysis of results for fiscal ended on December 31st, 2023 compared to last year
Revenues
Consolidated revenues for fiscal year ended on December 31st, 2023 amounted to AR$ 130,452 million, 32.8% higher than the AR$ 98,235 million for last year.
Consolidated regulated revenues for fiscal year ended on December 31st, 2023 amounted to AR$ 116,299 million, 35.1% higher than the AR$ 86,060 million for last year, due to the tariff adjustments as from January, August and November 2023.
Consolidated non-regulated revenues for fiscal year ended on December 31st, 2023 amounted to AR$ 14,153 million, 16.2% higher than the AR$ 12,175 million for last year, due to the tariff adjustment as from January, August and November 2023, for Cuarta Línea, Choele Choel - Puerto Madryn and TIBA.
Operating and administrative expenses
Consolidated operating and administrative expenses for fiscal year ended on December 31st, 2023 amounted to AR$ 115,421 million, 22.7% higher than the AR$ 94,083 million for last year, mainly due to an increase of 20.6% (AR$ 10,835 million) in labor costs and 421.6% (AR$ 8,317 million) in maintenance equipment costs due to the repairs of synchronous compensators No. 3 and 4 in Ezeiza Substation.
Other operating (expenses)/income, net
Consolidated other operating (expenses)/income, net for fiscal year ended on December 31st, 2023 resulted in a loss of AR$ 1.224 million, compared to a profit of AR$ 1.620 million for last year, mainly due to an increase in penalties for service quality.
Operating profit
Consolidated operating profit for fiscal year ended on December 31st, 2023, amounted to AR$ 13,807 million, 139.2% higher than the AR$ 5,772 million for last year, mainly due to the increase of 32.8% in revenues, partially offset by the increase of 22.7% in operating and administrative expenses and higher penalties for service quality.
8
Financial results
Consolidated financial results for fiscal year ended on December 31st, 2023 resulted in a loss of AR$ 2.611 million, compared to a profit of AR$ 2.680 million for last year, mainly due to a higher loss generated by exposure to inflation of net monetary assets and liabilities.
Income tax
Consolidated income tax for fiscal year ended on December 31st, 2023 resulted in a loss of AR$ 4,618 million, 47.7% higher than the AR$ 3,128 million for last year, mainly due to a higher profit before tax.
You may find additional information on the Company at:
www.transener.com.ar
www.transba.com.ar
www.cnv.gob.ar
9