Nevada Sunrise Metals Corp. announced that its joint venture partner, CopAur Minerals Inc. has reported the completion of the 2023 reverse circulation and diamond drilling program at the Kinsley Mountain Gold Project located in Elko County, Nevada, USA. A total of seven (7) RC drill holes and three (3) diamond drill holes comprising 2,285 metres (7,495 feet) were completed at the high-grade Western Flank Zone, Main Pit North, and the new Kinsley Ridge target.

All samples, including QA/QC samples, were shipped to ALS Global in North Vancouver, British Columbia, Canada for multi-element analysis and gold fire-assay. Results will be released following their receipt and interpretation by CopAur, operator of the Project. Kinsley Mountain hosts current indicated mineral resources comprising a National Instrument 43-101 compliant gold resource consisting of 418,000 indicated ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred ounces of gold averaging 1.51 g/t Au (2.44 million tonnes), at cut-off grades ranging from 0.2 to 2.0 g/t Au1.

Indicated resources are inclusive of 302,000 ounces averaging 6.11 g/t gold hosted within the Secret Canyon Sale at the Western Flank Zone. The Kinsley Mountain property hosts a historical past-producing mine that yielded 138,000 ounces of near-surface, open-pit oxide gold mined by Alta Gold Company between 1995-1999.