Corp Delta Resources Limited announced that it will add up to 3,000 additional metres to its previously announced 5,000 metre drill campaign at the Delta-1 Project in Thunder Bay. Initial results from the first four (4) drill holes and one (1) drill hole extension were announced on March 1, 2024 including 15.94 g/t over 10 metres. The 2024 drill campaign is ongoing with final assay results still pending.

This drilling program and Delta's future exploration programs in 2024 are fully funded. In 2023, Delta completed sixty (60) drill holes for a total of 19,620 metres at the Delta-1 project. This brings the total drilling at the property to eighty-six (86) drill holes or 26,288 metres, since Delta's 2019 acquisition of the project.

Other exploration work at the property in 2023 included a geological mapping, prospecting and sampling program that covered approximately ten (10) square kilometres as well as a 3D induced polarization geophysical survey and a high-resolution drone magnetic survey.